ZEISS
4 Responsibility Checklist |
4 Responsibility Checklist
The following is a checklist summarizing the requirements from the preceding sections of this doc-
ument. The customer should internally evaluate the proposed site to verify its compatibility with
all the requirements presented in this document. A ZEISS service representative can assist with the
checklist to evaluate which requirements are already met, and which requirements are yet to be
completed. ZEISS can be requested to assist with the checking of the environmental conditions.
Environmental conditions in and around a system can change with time due to various changes to
the building, new equipment being installed or other reasons. Should the environmental condi-
tions change due to changes to the building or other potential external influence after a site in-
spection was done, the customer should notify ZEISS to potentially redo the environmental in-
spection.
See also
2
Installation Requirements ZEISS Lightsheet 7 | en-US | Rev. 1 | 349500-8186-000
19
Summary of Contents for Lightsheet 7
Page 1: ...Installation Requirements ZEISS Lightsheet 7 ...
Page 21: ......