Responsibility Checklist
Effective from: 04/2020
Company name:
Address:
Contact person:
Requirements
Fulfillment
Comments
Yes
(Checked
and
complete)
Partially
(Partially
fulfilled)
No
(Checked
but not
fulfilled)
N/A
(not
applicable)
Environmental Requirements
Acoustic noise
Air Quality
Electromagnetic Compatibility
Magnetic Field
Vibration
Location Requirements
Installation Plan
Space Requirements
Air Conditioning
Earthing
Mains Connection
Network Connectivity
Safety and Radiation Information
X-Ray
Laser Safety
Biosafety Level of the Laboratory
Cooling Water Supply
Cooling liquid and/or chemicals
Exhaust Line
Gas Supplies
Compressed Air
Nitrogen
Additional Gas
Transport and Storage
Place, date
Name
Signature
The above signature conveys that the Installation Requirements have been read and understood. The customer further understands that some of these
requirements are necessary to help assure the safety of personnel, or to prevent damage to the microscope or the facility. The customer further understands
that some of the requirements must be fulfilled in order for the microscope to meet its full performance capabilities.