![Zehnder Rittling Eversky 500 Installation, Service And User Manual Download Page 55](http://html1.mh-extra.com/html/zehnder-rittling/eversky-500/eversky-500_installation-service-and-user-manual_4422669055.webp)
55
Zehnder Eversky
20. Periodic maintenance
20.1. General information
The maintenance and decommissioning of the installations must be carried out under conditions that ensure compliance
with the applicable regulatory environmental requirements. Maintenance must be carried out at least once a year or as
required by applicable regulations (fire safety, etc.). Depending on the installation and operating conditions, the
inspection interval may be reduced. The warranty will be void if the maintenance instructions are not followed.
Before commencing any maintenance or repair work, it is imperative that the power supply is switched off and that it
cannot be inadvertently switched on again (lock the proximity switch in the off position for this purpose).
Servicing and maintenance work must be carried out by qualified personnel equipped with the appropriate tools and
equipment (personal protective equipment, multimeter, etc.).
Component
Interval
Action