15
5.0
Commissioning & Inspection Record
5.1 This section should be used to record all installation details. The Commissioning Engineer should use the
following Parts 1 to 3, to record important information relating to the installation, of which, copies should
be given to the Building Control Body (BCB), the Developer, the installer and also be incorporated into the
Homeowner Pack for the homeowner to keep.
Part 1 - System details and declaration
• Part 1 System details and declarations
• Part 2a Installation details
• Part 2b Inspection of installation
• Part 3 Airflow measurement test and commissioning details
1.1 Installation Address Details
Dwelling Name / Number
Street
Locality
Town
Country
Post Code
1.2 Installation Details
System Classification* System 4 - Continuous Mechanical Supply and Extract with Heat Recovery
Manufacturer Zehnder Group UK Limited
Model Number
Serial Number (where available)
Location of MVHR Unit
1.1 Installation Checklist - General (all Systems)
Tick as appropriate
Has the system been installed in accordance with manufacturer’s instructions?
Yes
No
Have relevant system installation clauses been followed as detailed in Tables 1, 3, 5
Yes
No
and 7 as applicable?
Part 2a - Installation
*Note: If a system has been installed that is not defined by System 1 to 4 in Approved Document F, further installation
checks and commissioning procedures may be required. Seek particular guidance from the manufacturer for these
systems.
Type of ductwork installed (e.g. rigid, semi-rigid)
If any deviation from Tables 1,3, 5 and 7, these should be
detailed here.
Description of installed controls (e.g. timer, central control,
humidistat, PIR, etc.
Location of manual / override controls