6
2.2 Installation Engineers Details
Name
Company
Address Line 1
Address Line 2
Telephone Number
Post Code
Signature
Competent Person Scheme/
Registration Number (if applicable)
Date of Installation (completion)
Part 2b – Inspection of Installation
This section should be completed before completing Part 3.
2.3a Visual Inspections – General (all Systems) Tick as appropriate
Total installed equivalent area of background ventilators in dwelling?
Total floor area of dwelling?
Does the total installed equivalent ventilator area meet the requirements given in
Tables 5.2a, 5.2b, or 5.2c in ADF?
Have all background ventilators been left in the
open position?
Have the correct number and location of extract fans/terminals been installed
that satisfy Table 5.2a in ADF?
Is the installation complete with no obvious
defects present?
Do all internal doors have sufficient undercut to allow air transfer between rooms
(i.e. 10 mm over and above final floor finish)?
Has all protection/packaging been removed (including from background ventilators)
such that system is fully functional?
For ducted systems, has the ductwork installation been installed in such manner that
air resistance and leakage is kept to a minimum?
Are the correct number and size of background ventilators provided that
satisfy ADF?
Has the entire system been installed such that there is sufficient access for routine
maintenance and repair/replacement of components?
2.3b Visual Inspections – General (Systems 3 and 4 only)
Have appropriate air terminal devices been installed to allow
system balance?
Has the heat recovery unit (System 4 only) and all ductwork been effectively insulated
where installed in unheated spaces?
Condensate connection is complete and drains to an appropriate location
(System 4 only)?
mm
m
2
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Summary of Contents for Centair CMEV.4
Page 11: ...11...