Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
–
A
ppl
ic
at
ion:
G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
23/44
3.2.
Connecting the AC power cables
Connect the station to the AC power supply network or power grid using AC power cables.
Context
The AC power cables used for the charging station must be three-pole outdoor cables. For easier
installation, use flexible cables. The specific section recommended for connections is at least 6mm
2
.
For safety reasons, make sure to use suitably sized cables, otherwise the
current may cause overheating or overloading, which could result in a fire.
Note
Cable connection procedure
1)
Remove a suitable length of the protective sleeve, as shown in figure (A: 80~100 mm B: 6~8 mm).
Figure 13 - Connecting the AC output cables (1)
2)
Connect the AC power cable according to the following criteria:
•
Connect the ground wire (yellow-green) to the hole labelled “PE”, and tighten the cable using a
screwdriver as described in the previous paragraph.
•
Connect the line wires (brown, black, grey) to the holes labelled “L1, “L2, “L3”, and tighten the
wires using a screwdriver.
•
Connect the neutral wire (blue) to the hole labelled “N”, tighten the wire using a screwdriver.