User Manual 3PH HYD5000-HYD20000-ZSS
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1. of 16/03/2021 - Application: GID
22/138
4.
Electrical connections
Before making any electrical connections, make sure that the DC circuit breaker is switched off. The
stored electrical charge remains in the capacitor after the DC circuit breaker has been switched off, for
safety reasons, wait 5 minutes for the capacitor to discharge completely.
The PV modules generate electricity when exposed to sunlight, and can
create electric shocks. Therefore, before connecting the DC power cord,
cover the PV modules with a dark covering.
Danger
The inverter must be installed and serviced by a professional
electrician. Wear protection equipment when working on high
voltage/high current systems such as inverters and battery systems.
Attention
For the 3PH HYD5000-HYD20000-ZSS inverter, the open-circuit voltage
(Voc) of the strings related to the modules connected in series must be
≤ 1000V
Note
The PV modules must have an IEC 61730 classification of Class A.
Model
Isc PV (absolute maximum)
Maximum output overcurrent
protection
3PH HYD5000 ZSS
15A/15A
8A*3
3PH HYD6000 ZSS
10A*3
3PH HYD8000 ZSS
13A*3
3PH HYD10000 ZSS
30A/30A
20A*3
3PH HYD15000 ZSS
25A*3
3PH HYD20000 ZSS
32A*3
Table 5 - Models of three-phase hybrid models
There are two ways to measure the currents exchanged with the grid; refer to the technical notes in
the website www.zcsazzurro.com for more details.