Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
-
Appl
ic
at
ion
: G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. - 94189
Certified Company ISO 9001 - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/08/2020 Rev. 1.2 “User Manual 7000-BE-24”
9/43
Before connecting the electrical cables, make sure to properly disconnect
the voltage on the AC connection cables, and do not connect any charging
cables for electric vehicles.
Danger
All installation operations must be carried out by a professional electrician,
who has carefully read this manual and understands its contents!
Warning
Before connecting the charging station to the grid, make sure that all the
necessary permits have been obtained from the local grid operator and
that all the electrical connections have been completed by a professional
electrician.
Attention
Do not remove the information label or tamper with the charging station.
Otherwise, ZCS will not provide any warranty or assistance
Note
Operation
Do not use the product if it has any defects, cracks, scratches or leaks, but contact your dealer or ZCS
technical service.
Contact with the electrical grid or the terminal of the equipment may
cause electrocution or fire!
•
Do not touch the terminal or the conductor connected to the electrical
grid.
•
Follow all the instructions and safety requirements relating to grid
connection
Danger