Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
-
Appl
ic
at
ion
: G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. - 94189
Certified Company ISO 9001 - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/08/2020 Rev. 1.2 “User Manual 7000-BE-24”
19/43
3.3.
Materials and cables
First name
Specifications
Quantity
Power cord
≥ 3 × 6mm
2
single-phase
Second requirement
Mains cable
STP, CAT5E, 8 cores
Second requirement
Connector for mains cable
RJ45
Second requirement
Insulating tape
0.15 mm × 18mm; 0-600V;
0°C-80°C
Second requirement
Cable tie
4 × 200mm
Second requirement
Table 4 - Electrical equipment
It is important that all cables used are suitable for outdoor use
NOTE:
For safety reasons, make sure to use suitably sized cables, otherwise the current may cause
overheating or overloading, which could result in a fire.
Figure 8 - Logical sequence for cable connection
4.
Electrical connections
This chapter describes the electrical connections of the 7kW charging station. Carefully read this section
before connecting the cables. All the local, regional and national regulations must be complied with
during installation, repair and maintenance of the product.