background image

  Settings 

   

These paramters control test air presented to the test part. The Pre-Fill is used with larger part 

volumes (greater than 300cc) This timer controls the valve that will introduce a second source of air to the 
part, typically at a higher pressure. This function can be either timed, or Auto stopped at a value entered on 
the Pre Fill pressure value box. 

The Fill time is the amount of time the regulator will be allowed to supply test pressure to the part. 

The Settle time is used to allow for thermodynamics and/or compliance of the part to reach equilibrium. 

The Test step is the amount of time where the change in pressure will be measured for a Pass/Fail status 
of the test. 

The Vent step is a safety mechanism to allow test pressure to be evacuated from the test part. 

The Decay value is the amount of change in pressure that will cause a fail attribute to be associated with 
the part. 

 

 

 

 

 

 

 

 

 

 

 

 

Reviews: