Section 6 -
!"#$%&$"$'&
$1
!"#$%&'%(! !
!
"#$!%$&'$(#!))!*!+,,-.!*!/01$(2!3#&$(#(2!4356!*!57$&8! !
!
!
999:;$72<:#7! *! #(=2>;$72<:#7
I
,
'(+*$!*(*#!
IHC
,)36345=,6F482
IH?
,'596:3656;3,W4FZ458
=K>)
L
, thanks to the construction methods and employed materials, is
easy to maintain. A minimal, simple, accurate and constant maintenance allows a long-lasting and
regular functioning of the valve, keeping uncharged its performance.
\) D6I);K>)M>->I(+)L+>(-'-M)6F);K>),(+,>)7F6`:,<23,
metallic, sharp or pointed objects. Use
only soft brushes or cotton rags.
\) T++);K>)N('-;>-(-L>)J6IX5)6-);K>),(+,>)
must be performed by qualified personne
+)(-O)
after the supply pressure system has been discharged
\) D6I);K>)-6HH+>)L+>(-'-M)
use only
cleaning needles supplied by the valve manufacturer: if
you use other sharp objects the nozzle could be
7585Z37
X,
Use only
6I'M'-(+)5Y(I>)Y(I;5
\) =K>),(+,>)N45;)Q>)J(5K>O)
only and exclusively
)J';K)J(;>I.)>5Y>L'(++<)'F)<64)->>O);6)
I>Y+(L>);K>)-6HH+>)6I);K>)->>O+>
\)
Every evening and if you expect a long work break put some grease on the nozzle tip
$+'+*)a
bP($,$&,0&
C
Every day, before the start production
\) !6)(),(+,>);>5;
\) 3+>(-);K>),(+,>)>E;>I-(++<
?
Every day, at the end of production
\) !6)(),(+,>);>5;
\) 3+>(-);K>),(+,>)>E;>I-(++<
\)
Put some grease on the nozzle tip
O
Before a production break longer than two
J>>X5
\)
Drain the fluid from the system and wash it
L6NY+>;>+<)J';K)J(;>I
\) ">(,>);K>)5<5;>N)J';K)J(;>I)'-5'O>
K
After a production break longer than two
J>>X5
Discharge the water from the system and fill it with
the adhesive fluid
R
Every month or after 2000 working hours
T5)Y6'-;)A)(-O)C
I
Every year or after 4000 working hours
\) T5)Y6'-;)A)(-O)C
\) V>Y+(L>)Y655'Q+>)J6I-)Y(I;5
*Approximate values that can change depending on the type of glue, adhesive or fluid used.
For the use of special fluid we recommend to contact the Zator company for any questions.
Summary of Contents for DLK22S
Page 1: ...0...
Page 6: ......
Page 7: ...USER AND MAINTENANCE MANUAL ELECTROMAGNETIC VALVE DLK22S...
Page 21: ...Section 2 AFET NORM ONFORMIT OF E 01 2 3 2 4356 57 8 999 72 7 2 72 7...
Page 38: ...0 0 38 9 5 I K D 5LI J K 8 1 9 5 I K and with a 8mm wrench screw it into the valve body 7 E...
Page 41: ...Section 8 C 01 2 3 2 4356 57 8 999 72 7 2 72 7...
Page 43: ...Section 9 CA 01 2 3 2 4356 57 8 999 72 7 2 72 7 T T N A C 2 B 7 8 1 0 A C 2 17 B 18...
Page 46: ...ELECTROMAGNETIC VALVE 4 CB USER AND MAINTENANCE MANUAL...
Page 47: ......
Page 48: ...1 0012 345 6 7 6 879 9 A1 0 BBC0A A2 D E A1 0 BBC0A 2 F6GH 6I JJJ H 6I...