SECTION 6 - MAINTENANCE
25
Zator
Via Galvani, 11 - 20095 - Cusano Milanino (MI) - Italy
www.zator.it - [email protected]
The electromagnetic valve DLK22KV, thanks to the construction methods and employed materials, is
easy to maintain. A minimal, simple, accurate and constant maintenance allows a long-lasting and regular
functioning of the valve, keeping uncharged its performance.
• For the general cleaning of the valve don’t use metallic, sharp or pointed objects. Use only
soft brushes or cotton rags.
• All the maintenance works on the valve must be performed by qualified personnel and
after the supply pressure system has been discharged
• For the nozzle cleaning use only cleaning needles supplied by the valve manufacturer: if
you use other sharp objects the nozzle could be damaged
• Use only original spare parts
• The valve must be washed only and exclusively with water, especially if you need to replace
the nozzle or the needle
• Every evening and if you expect a long work break put some grease on the nozzle tip
TIMING*
WHAT TO DO
1
Every day, before the start production
• Do a valve test
• Clean the valve externally
2
Every day, at the end of production
• Do a valve test
• Clean the valve externally
• Put some grease on the nozzle tip
3
Before a production break longer than two
weeks
• Drain the fluid from the system and wash it
completely with water
• Leave the system with water inside
4
After a production break longer than two
weeks
Discharge the water from the system and fill it with
the adhesive fluid
5
Every month or after 2000 working hours
As point 3 and 4
6
Every year or after 4000 working hours
• As point 3 and 4
• Replace possible worn parts
*Approximate values that can change depending on the type of glue, adhesive or fluid used.
For the use of special fluid we recommend to contact the Zator company for any questions.
6
MAINTENANCE
6.1
General norms
6.2