YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
Page 24
DP-2010JF ver.05202005
SSSSS
ECTION
ECTION
ECTION
ECTION
ECTION
77777::::: P
P
P
P
P
R
RR
RROGRAMMING
OGRAMMING
OGRAMMING
OGRAMMING
OGRAMMING
FOR
FOR
FOR
FOR
FOR
P
P
P
P
P
R
RR
RROPOR
OPOR
OPOR
OPOR
OPORTION
TION
TION
TION
TIONAL
AL
AL
AL
AL
-----
TTTTTO
O
O
O
O
-----TTTTT
IME
IME
IME
IME
IME
W
W
W
W
W
/DPS-2
/DPS-2
/DPS-2
/DPS-2
/DPS-2
3. Adjust the pump volume adjustment knob to
the value used in the calculations in step 1.
4. Turn mode switch 1 to on.
5. Turn mode switch 2 to on.
6. Turn mode switch 3 to off.
7. Turn mode switch 4 to off.
8. Press the test button once to initiate the
timer sequence.
Number of turns open on the pump volume knob
3
6
12
Sample pump displacement per stroke
.1cc
.2cc
.4cc
System
Mutual
Approved
Factory
IMPOR
IMPOR
IMPOR
IMPOR
IMPORTTTTTANT NO
ANT NO
ANT NO
ANT NO
ANT NOTE:
TE:
TE:
TE:
TE:
For the Z-65 to operate the DP-2010 System, a
minimum pressure differential of 3" of water
must exist between the high pressure and low
pressure ports of the DPS-2.
figure 16
figure 17
Summary of Contents for DynaPak DP-2010JF
Page 1: ...DynaPak GasSampler S Y S T E M S U P P O R T M A N U A L DP 2010JF...
Page 2: ......
Page 3: ...DP 2010JF INSTRUCTION OPERATING MANUAL Version 05202005...
Page 4: ......
Page 63: ......