Standard System Connections
a. The DynaPak 2010 requires a 1/2" FNPT
pipeline connection.
b. The DynaPak 2010 sampler should be
mounted vertically in a horizontal run of the
pipeline.
c. The end of the sampler probe should penetrate
the center 1/3rd of the pipeline.
d. The end of the sample probe should be cut
parallel to the pipeline.
e. Before applying pipeline pressure to the Dy-
naPak 2010, ensure that the isolation valve and
purge valve are closed.
f. After pipeline pressure has been applied to the
sampler, check the probe body/pipeline connec-
tion using a liquid leak detector.
CA
CA
CA
CA
CAUTION:
UTION:
UTION:
UTION:
UTION:
Incorrect operation of valves (over
tightening) can result in damage to the
valve components (isolation valve
bonnet assembly) which might result in
the valve stem being screwed out of the
probe body. This of course results in
product at pipeline pressure being
vented continually through this port
until this section of the pipeline is shut
in. Be aware of the following proce-
dures and information.
· DynaPak valves are of soft seat
design and should only be closed
or opened with fingers. No
wrenches should ever be used.
·If a valve will not seal off with
finger tight operation the valve
should have maintenance
performed to allow proper
operation of the valve.
Center 1/3
1/3
1/3
1/3
Center 1/3
1/3
1/3
1/3
figure 5
Summary of Contents for DynaPak DP-2010JF
Page 1: ...DynaPak GasSampler S Y S T E M S U P P O R T M A N U A L DP 2010JF...
Page 2: ......
Page 3: ...DP 2010JF INSTRUCTION OPERATING MANUAL Version 05202005...
Page 4: ......
Page 63: ......