11.1 Recommended preventative maintenance
schedule
Every sampling situation is unique.  Below are our
recommendations for average conditions.  A
higher BTU content will necessitate more frequent
pump/filter maintenance.

a. Clean and lubricate the sample pump every six
months.

b. Check the filter element every six months,
replacing as necessary.

c. Test the battery every month.

d. Test the system for leaks each time a fitting or
connection has been made.

11.2 Cleaning and lubricating the DP-2000N
pump:
a. Close the isolation valve.

b. Disconnect the plastic tubing from the solenoid
valve to the pump diaphragm housing by
depressing the tubing release sleeve on the
diaphragm housing fitting while pulling out the
tubing.  It is not necessary to remove the fitting
from the diaphragm housing.

c. Remove the sample discharge (1/8" stainless
steel tubing) from the pump body.

d. Screw the stroke adjustment knob all the way
down to the 0 cc/stroke setting.

e. *Unscrew the pump body by hand from the inlet
check valve assembly.  Separation at this point is
recommended to maintain proper tubing location
and alignment between the pump body and the
probe body.  Do not  remove the inlet check valve
body from the manifold unless cleaning is
necessary.  To replace the inlet check valve o-ring,
carefully cut the o-ring off the head of the dart and
stretch the new o-ring over the head of the dart
using a light coat of assembly grease.

f. Remove the diaphragm housing from the pump
body by unscrewing the diaphragm housing and
carefully pulling the plunger out of the pump body.
Inspect the plunger shaft for damage or wear.  The
diaphragm chamber houses the diaphragm, return
spring, stroke adjustment screw and plunger
assembly.  The diaphragm chamber should not be
disassembled unless one of these items needs
replacing.

*Screw the stroke adjustment screw all the way
down.

11.2 e

11.2 f

11.2 b

11.2 a

11.2 c

11.2 d

11. Sampler maintenance

Summary of Contents for DynaPak 2010N Series

Page 1: ...DynaPak2010N SystemSupport Manual ANSI 900 Version05302001ATEXRev...

Page 2: ...rantysetforthherein YZ sentireliabilityandthecustomer sexclusiveremedywillbereplacementoftheproduct s or atYZ soption YZ sreasonableefforttomaketheproductmeetthewarrantysetforthherein YZdisclaimsallot...

Page 3: ...ning installation operation contact your YZ representative or YZ Customer Service at 936 788 5593 2 System Components The primary components of the DynaPak 2010N Sampling System are illustrated here 1...

Page 4: ...sig using DPS 2 C Proportional to flow sampling in this mode of operation the Z 65 counter operates as a dividing counter The Z 65 counter periodically energizes a low power solenoid valve As in the o...

Page 5: ...ch could cause aerosols or significant pressure drops 4 2 The sampler should not be located within the defined meter tube region AGA 3 manual A The number of unobstructed straight pipe diameters upstr...

Page 6: ...CAUTION Incorrect operation of valves over tightening can result in damage to the valve components isolation valve bonnet assembly which might result in the valve stem being screwed out of the probe...

Page 7: ...high pressure supply valve without ensuring that the equalization valve is open Failure to do so may damage the DPS 2 s internal components d Open the other supply valve e Close the equalization valve...

Page 8: ...created 6 2 Variable volume constant pressure cylinder The free floating piston cylinder DuraSite may be installed in a horizontal position on an optional vessel rack Free floating piston cylinders sh...

Page 9: ...b on the top of the pump counterclockwise to set the pump displacement at 4cc stroke 7 4 Move all of the mode switches on the Z 65 to their off positions 7 5 Move both timer counter dials to the 0 pos...

Page 10: ...E The time 18 minutes above corresponds to the dial setting shown for the Z65 model with the timer range setting in the factory position jumper on the two left pins See section 12 4 Timer Range Settin...

Page 11: ...on 8 6 Turn mode switch 3 to on 8 7 Turn mode switch 4 to off 8 8 Press the test button once to initiate the timer sequence 8 3 Adjust the pump volume adjustment knob to the value used in the calculat...

Page 12: ...time 18 minutes above corresponds to the dial setting shown for the Z65 model with the timer range setting in the factory position jumper on the two left pins See section 12 4 Timer Range Setting 3 2...

Page 13: ...on 9 6 Turn mode switch 3 to off 9 7 Turn mode switch 4 to off 9 8 Press the test button once to initiate the timer sequence NOTE For the Z 65 to operate the DP 2010N System a minimum pressure differ...

Page 14: ...ng connections to the Z 65 terminal strip see illustration b Turn mode switch 1 to on c Turn mode switch 2 to off d Turn mode switch 3 to on e Turn mode switch 4 to off OR 10 3 If the input is a volta...

Page 15: ..._______ 5 pulses volume metered pulses MMCF or pulses MCM e __________ 6 counter setting a x c x d x e b Example 1 English Gas Flow Units Example 2 Metric Gas Flow Units pumpdisplacement a 2cc 2cc sam...

Page 16: ...e into the memory Sample pump displacement per stroke 1cc 2cc 4cc Number of turns open on the pump volume knob 3 6 12 NOTE If the calculated counter setting is less than 1 or greater than 99 the pulse...

Page 17: ...DynaPak 2010N Version 05302001 ATEX Rev YZ Systems Inc 3101 Pollok Drive Conroe Texas USA 77303 P 936 788 5593 F 936 788 5720 17...

Page 18: ...mp body d Screw the stroke adjustment knob all the way down to the 0 cc stroke setting e Unscrew the pump body by hand from the inlet check valve assembly Separation at this point is recommended to ma...

Page 19: ...all o rings and bushings to prevent damage j Install the body bushing into the bottom of the pump body NOTE Apply a light coat of assembly grease on the plunger shaft prior to installation k Insert a...

Page 20: ...te if the battery is low NOTE The solenoid must be connected to test the battery condition Battery condition cannot be tested with a volt meter Replacing a Depleted Battery 1 Remove the four thumb scr...

Page 21: ...s for the DynaPak 2000N Series gas samplers Part Number Description Qty Location C4 0004 Filter element 1 see diagrams 3 and 4 D3 0002 DP 2000N pump seal kit 1 see diagrams 1 and 2 D3 0003 YZ filter r...

Page 22: ...s sensing flow in the pipeline the green LED should illuminate If flow is not present the red LED should illuminate 12 3 LCD Stroke Indicator Test Mode A To test the stroke counter set the mode switch...

Page 23: ...e factory position far left position 12 4 Timer Range Setting A There are two Z 65 models the Z 65 6 1 and Z 65 6 03 Each Z 65 timer has two ranges for the timer setting dials 1 Z 65 6 1 Range Setting...

Page 24: ...minutes set the configuration jumper to the center position Note To obtain maximum battery life choose the longest solenoid stroke rate possible Mutual System Approved Factory factory positioned for 1...

Page 25: ...he green LED will turn on and off and the red LED will illuminate again This will normally occur very quickly and give the appearance that the green LED blinks on when the pulse input is received and...

Page 26: ...N B1 0020 Inlet Screen P N C4 0006 Inlet Check Valve Spring Guide Inlet Check Valve Spring O Ring 006 P N A5 1006 O Ring 012 P N A5 1108 O Ring 108 P N A1 0099 Male Connector 1 8 P X 1 8 T P N B1 0015...

Page 27: ...ing P N B1 0051 P N C3 0005 P N B1 0030 Set Screw P N C0 0096 P N C0 0014 Cap Screw 6 Each O Ring 012 P N B1 0020 P N C0 0026 Inlet Screen P N C4 0006 P N C3 0008 P N C4 0022 20 Micron Filter Inlet Ch...

Page 28: ...28 Diagram 3 YZ filter regulator assembled...

Page 29: ...rt A3 0073 O Ring 012 Retaining Nut P N A5 1012 Seat P N A3 0072 Upper Dart P N A3 0071 Upper Spring P N C3 0010 P N A3 0070 Piston P N A3 0069 Piston Spring Spring Cap P N A3 0068 P N A3 0067 Bonnet...

Page 30: ...less Steel Set Screw Inlet Rupture Disc 1800 psi P N A3 0083 Rupture Disc Retainer P N A3 0084 YZ Valve Body P N A3 0137 0 1000 PSI LinkPlus Model No C1 0005 0 2000 PSI LinkPlus Model No C1 0006 0 600...

Page 31: ...P N E0 5001 Magnet Diaphragm SS Hex Nut P N C0 0048 Qty 8 P N A6 0013 P N G2 0002 Cable Assembly 30 Ft Shrink Wrap SS Bolt P N C0 0047 Qty 8 P N H2 0002 Qty 2 Magnet Support Body Diaphragm Body Diaph...

Page 32: ...65 6 Controller Assembly 1 1 Model Z 65 6 1 F2 0001 Model Z 65 6 03 F2 0018 2 Battery Pack E3 2001 1 3 Stroke Counter Assembly G1 0001 1 4 Terminal Strip 6 Position H1 0001 1 5 BCD Switch E1 0001 2 6...

Page 33: ...on 05302001 ATEX Rev YZ Systems Inc 3101 Pollok Drive Conroe Texas USA 77303 P 936 788 5593 F 936 788 5720 33 Diagram 8 Z 65 Installation Notes Wiring Control Documentation System Installation Notes a...

Page 34: ...hould be closed The product connection is slowly broken in order to vent any trapped product After vessel removal all connections shouldbecheckedforleaksandthepre chargeandproduct valveportscappedtopr...

Page 35: ...t Head YZ UniValve Purge Valve Nut P N A3 0080 P N A3 0063 Valve Seat P N C6 1003 Ser 4608 P N 12 1006 Ser 0321 and Prior P N 12 1007 Ser 0322 0613 P N 12 1008 Ser 0614 4087 P N C6 1002 Ser 4088 Pisto...

Page 36: ...36 Notes...

Reviews:

Related manuals for DynaPak 2010N Series