background image

Revised 27/05/10 

 

 

 

ALLURE Outdoor Install May2010 

 

 

Page 2 of 17

 

Designed and built by: 

YUNCA GAS  
2 Donald Street, Kaikorai Valley, Dunedin 9011  
PO Box 500, Dunedin 9054. 

 

Phone 03 488 4342 

Fax  03 488 1017 

Email [email protected] 

Web www.yunca.co.nz 

 

CONTENTS 

PAGE 

 

INDEX, INTRODUCTION 

 

CAUTIONS, MAINTENANCE 

 

INSTALLATION and SERVICING 
 

DIMENSIONS and TIMBER FRAMING 

 

CLEARANCES, FLUE INSTALLATION, WEATHER COVER 

 

PLACING 

 

CONNECTION TO GAS SUPPLY & TESTING PRESSURES  7 - 8 

 

REMOVING PANELS and PARTS FOR SERVICING 

9 - 10 

 

COAL AND LOG LAYOUTS 

11 - 12 

 

 

 

COMMISSIONING, OPERATING, WARRANTY 

13 

 

Appendix A 
FAULT FINDING GUIDE 

14 

 

Appendix B 
SPARE PARTS LIST 

15 - 16 

 

Appendix D 
WARRANTY REGISTRATION – CUSTOMER COPY 

16 

 

ATTACHMENT 
WARRANTY REGISTRATION – MANUFACTURER COPY 

 

 

INTRODUCTION

 

 

Welcome and congratulations on purchasing your 

YUNCA ALLURE OUTDOOR 

MANUAL  CONTROL

  flued  gas  open  fire.  Please  read  these 

Operating 

Instructions

  carefully  before  attempting  to  operate  the  heater,  and  ensure  all 

members of your home understand how this elegant heater functions. If you have 
any questions please contact your Yunca dealer. 

 

These instructions cover only the OUTDOOR MANUAL CONTROL models. 

 

Please fill out the warranty on the last page, and return the enclosed registration form promptly.  

 

The 

YUNCA ALLURE OUTDOOR MANUAL CONTROL

 FLUED GAS FIRE is manufactured to 

New Zealand standards. 

Summary of Contents for 930

Page 1: ...URE OUTDOOR GAS OPEN FIRE Stainless Steel Fascia 930 730 MODELS May 2010 INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION These instructions should be stored in a convenient safe place for read...

Page 2: ...pendix A FAULT FINDING GUIDE 14 Appendix B SPARE PARTS LIST 15 16 Appendix D WARRANTY REGISTRATION CUSTOMER COPY 16 ATTACHMENT WARRANTY REGISTRATION MANUFACTURER COPY INTRODUCTION Welcome and congratu...

Page 3: ...IN THE VICINITY OF THIS APPLIANCE WHILE IT IS OPERATIONAL NEVER OPERATE THE FIRE WITH THE COVER IN PLACE STAINLESS STEEL FASCIAS and WEATHER COVERS are shipped with protective plastic in place to red...

Page 4: ...ble is a Bottom Fascia Strip for each model This strip 85mm high is fitted below a regular three sided fascia for a picture frame look TIMBER FRAMES Should a timber frameout be used outdoors then the...

Page 5: ...e cap is 1200mm i e one standard flue length Flue and Liner should be fitted with top and bottom spacer brackets STAINLESS STEEL FASCIA WEATHER COVER Gutter Strip A gutter strip is fitted to run any w...

Page 6: ...ted before the fire is finally positioned Fig 2 6mm dia x 50mm Coach Bolts Supplied If the appliance is being attached to a concrete floor dyna bolts should be used If the floor is wooden the bolts us...

Page 7: ...d for leaks before operating the fire Gas pressure requirements Correct gas pressure and the use of a properly sized gas supply line are essential for the safe and efficient performance of this applia...

Page 8: ...e tested at the test nipple on the side of the BM 733 control Operating pressure is adjusted at either the LPG or NG in line regulator Gas Type Pressures and jet sizes appear on data plate The Allure...

Page 9: ...bottom strip is fitted using two screws 4 TOP LOUVRE 1 Top Slides out for easier access to the top front cowl and flue spigot refer 7 May be left in place if access to the flue spigot is not required...

Page 10: ...ve screw from centre hole and lift out 5 Rear Tray Remove screw from right and left side lift out 6 Burners Lift out 7 Manifold Baffles Lift out left and right baffles SETTING THE FIRE 1 Replace all p...

Page 11: ...per row The 730 model uses 10 coals per row layout as shown below from left to right Bottom Rear Row Bottom Front Row Top Rear Row Top Front Row 930 26 x No1 Coals 26 x No2 Coals 4 rows of 13 730 20 x...

Page 12: ...3 x No1 13 x No2 730 10 x No1 10 x No2 Layout shown is for the 930 model using 13 coals per row The 730 model uses 10 coals per row layout as shown below from left to right Rear Row Front Row Logs 930...

Page 13: ...output as required Turning off 1 Turn the control knob clockwise to the off position WARRANTY A limited Five Year Warranty covers the Yunca Allure Outdoor Gas Open Fire against defects in materials an...

Page 14: ...t No Gas Supply LPG Check gas cylinder arrange refil Natural Check with gas supplier Pilot will not stay lit Weak or improperly located pilot flame Adjust the height of thermocouple The flame should e...

Page 15: ...jector burner 930 specify LPG or NG NAT Burner Plug Insert 6505 Delta Pilot Burner Assembly with Spark Electrode 6606GO Pilot Pipe 6502 BM733 Control Valve 6513P Thermocouple Spark electrode 6791GO9 9...

Page 16: ...op Louvre 2 at bottom Hearth Weather Cover Key where an appears this substitutes for the model number i e 9 930 7 730 CUSTOMER COPY YUNCA ALLURE OUTDOOR STAINLESS STEEL WARRANTY REGISTRATION PLEASE CO...

Reviews: