background image

8.  Flip the Storm over and place the rubber gasket on 

the bottom side into place (

Figure 11

).

9.  Place bottom mounting plate into place lining up the 

screw holes with the holes in the main case (

Figure 

12

).

10.   Insert the 4 screws and tighten until snug

11. Finally finish tightening the 4 screws holding the 

top mounting plate in place (

Figure 13

) and the 

reassembly is complete.

Figure 11: Place the rubber gasket into place

Figure 12: Bottom mounting plate lining up with the holes

Figure 13: Tighten the 4 screws into place

ysi.com/storm3

D114 

I

 Tech Note 

I

 Storm 3 SIM Card Replacement

Summary of Contents for STORM 3

Page 1: ...STORM 3 BROWSER BASED SOLUTION FOR DEPENDABLE DATA LOGGING SIM CARD REPLACEMENT Tech Note D114 0117 ...

Page 2: ...en to access replace and put the Storm 3 back in working order This technical note serves to explain this process ysi com storm3 Figure 1 YSI Storm3 data logger Replacing the SIM Card Tech Note D114 0117 Storm 3 Data Logger Article written by Matthew Longfield YSI Technical Applications and Support Specialist Figure2 Bottomplateof theStorm3dataloggershowingthe4 screws Figure 3 Bottom plate and fou...

Page 3: ...e top plate so it cannot be pulled too far away or the cable could be damaged Once the plate is pulled away slide the rubber gasket down the cable so that it is loose from the main case 3 Separate the two halves of the main Storm 3 case by carefully pulling them apart Figure 6 4 Locate the SIM card on the green modem board just above where the antenna cable connects to the board Figure 7 Figure 6 ...

Page 4: ...op opening of the case so that it does not get pinched Figure 9 7 Slide rubber gasket into place Figure 10 then slide top mounting plate in place lining up the 4 screw holes with the holes in the case Insert the 4 screws and start them but do not tighten them all the way yet If screws are too tight you will have trouble lining up the screws for the bottom plate in the next step 8 Flip the Storm ov...

Page 5: ...main case Figure 12 10 Insert the 4 screws and tighten until snug 11 Finally finish tightening the 4 screws holding the top mounting plate in place Figure 13 and the reassembly is complete Figure 11 Place the rubber gasket into place Figure 12 Bottom mounting plate lining up with the holes Figure 13 Tighten the 4 screws into place D114 I Tech Note I Storm 3 SIM Card Replacement ...

Page 6: ...y measuring instruments are designed for both laboratory and field use In addition to bench top and hand held instruments Xylem Analytics also builds monitoring systems and wireless networks that are able to operate in remote locations and challenging environments The company s water quality monitoring sondes can be fitted with a wide variety of sensors including dissolved oxygen PH temperature tu...

Reviews: