12. Find your VSD model from the list below,
and set the adjustments to the setting val-
ues in the following table. If your model is
not listed below, look for it in the next table of
drive model numbers with the ratings plug value.
a. TV2CMPRBW-40A
b. TV2CMPRBW-65A
c. TV2CMPRBW-50C
d. TV2CMPRBW-68A
e. TV2CMPRBW-46A
ADjUSTMeNT
SeTTiNG VAlUe
Long Time Pickup IR~
G
Long Time Delay TLD(S) LONG
2
Short Time Delay ISD(XIR)
SHORT
2
Ground Fault Pickup IG(XIN)
GND
0.2
Ground Fault Delay TSD/
TG(MS) SHORT/GND
J
Find your model from the list below, check the ratings
plug values in the first table, and set the setting values
for the adjustments listed in the second table:
DRiVe MODel NO.
RATiNGS PlUG VAlUe
TV2CMPRBW-40B
600
TV2CMPRBW-40C
800
TV2CMPRBW-65B
600
TV2CMPRBW-65C
800
TV2CMPRBW-50B
600
TV2CMPRBW-50C
800
TV2CMPRBW-68B
600
TV2CMPRBW-68C
800
TV2CMPRBW-46B
600
TV2CMPRBW-58B
600
ADjUSTMeNT
SeTTiNG VAlUeS
Short Delay Pick-up
2
Short Delay Time
INST
Ground Fault Pick-up
1
Ground Fault Time
150
The settings for the circuit breaker should
not be changed from the settings. The war-
ranty will be voided if the breaker settings
are changed.
13. Check the chiller for refrigerant leaks at joints or
water piping leaks. .............................................
14. Make sure 9 liters (2.38 gallons) of compressor
oil were added to both circuits. ..........................
15. Make sure the control panel is free of foreign
material (wires, metal chips, tools, documents,
etc.). Check for signs of water or moisture. .......
16. Make sure the leaving liquid temperature sensor
is coated with the heat conductive compound
(P/N 013-00890-000), and is inserted to the bot-
tom of the water outlet sensor well in the cooler.
This sensor must always be fully inserted in the
water outlet sensor well. ....................................
17. Make sure the flow switches are connected be-
tween Terminals 2 and 12 and 2 and 13 on Ter-
minal Block 1TB in the control panel. .................
18. Check whenever the pump contacts are used,
the coil of the pump starter should be suppressed
with an RC suppressor (P/N 031-00808-000). ...
B. START-UP
Panel check
Only qualified individuals are permit-
ted to service this product, and are to
be knowledgeable of, and adhere to, all
safe work practices as required by local
codes. Use proper personal protection
where and when required.
1. Verify that the voltage supply corresponds to
the unit requirement, and is within the limits as
specified in SECTION 4 - TECHNICAL DATA in
Form 201.30-ICOM2
.
.........................................
2. Make sure the unit switch at the bottom of the
keypad is in the OFF (O) position. .....................
3. Apply 3-phase power to the chiller. Turn on the
optional panel circuit breaker, if supplied. ..........
4. Verify the control panel display is illuminated.
To prevent the compressors from starting, make
sure that the SYSTEM SWITCHES key is off for
both systems. . ....................................................
5. Use a clamp-on ammeter to make sure the both
compressor heaters are turned on. Heater cur-
rent draw is approximately 3A. ...........................
6. Confirm that the compressor overload current
settings have been correctly adjusted by the fac-
tory. These are not normally required to be re-
set. Use the VSD DATA key on the control panel,
navigate to the COMP1 MOTOR OVERLOAD =
### AMPS and COMP2 MOTOR OVERLOAD
= ### AMPS screens. The values should match
the values on the overload setting label, which is
located inside of the VSD cabinet. If the values
do not match, an adjustment is required inside
the VSD cabinet by qualified service personnel. .