2. Vacuum dry and leakage checking
2.1. Vacuum Dry: use vacuum pump to change the moisture (liquid) into steam (gas) in the pipe and discharge
it out of the pipe to make the pipe dry. Under one atmospheric pressure, the boiling point of water(steam
temperature) is 100 . Use vacuum pump to make the pressure in the pipe near vacuum state, the boiling point
of water falls relatively. When it falls under outdoor temperature, the moisture in the pipe will be vaporized.
2.2. Vacuum dry procedure
There are two methods of vacuum dry due to different construction environment: common vacuum dry, special
vacuum dry.
. Common vacuum dry procedure
Vacuum dry (for the first time)---connect the all-purpose detector to the inlet of liquid pipe and gas pipe,
and run the vacuum pump more than two hours (the vacuum pump should be below -755mmHg)
If the pump can’t achieve below -755mmHg after pumping 2 hours, moisture or leakage point will still exist
in the pipe. At this time, it should be pumped 1 hour more.
If the pump can’t achieve -755mmHg after pumping 3 hours, please check if there are some leakage
points.
Vacuum placement test: place 1 hour when it achieves -755mmHg, pass if the vacuum watch shows no
rising. If it rises, it shows there’s moisture or leakage point.
Vacuuming from liquid pipe and gas pipe at the same time.
Summary of Contents for YOHC 12
Page 7: ...Part 2 Indoor units Ceiling Floor Type ...
Page 17: ...4 Service space 600mm 600mm ...
Page 20: ...6 1 3 YOKC 24 6 1 4 YOKC 30 ...
Page 21: ...6 1 5 YOKC 36 6 1 6 YOKC 48 YOKC 60 ...
Page 30: ...Discharge angle 60 FLOOR Airflow velocity Temperature ...
Page 37: ...Part 3 Outdoor Units Outdoor Units ...
Page 39: ...1 Dimensions 1 1 YOJC 12 290 315 285 530 62 590 750 110 1 2 YOJC 18 12 5 ...
Page 40: ...1 3 YOJC 24 330 62 895 860 590 141 1 4 YOJC 30 YOJC 36 ...
Page 41: ...1 5 YOJC 48 YOJC 60 ...
Page 43: ...3 Wiring diagrams 3 1 Cooling Heating 3 1 1 YOJC 12 3 1 2 YOJC 18 ...
Page 46: ...4 Field Wiring ...
Page 49: ...7 Sound levels 1m Microphone 12000btu h 18000btu h ...
Page 50: ...24000btu h 3000btu h 36000btu h 48000btu h 60000btu h ...
Page 66: ...Part 4 Installation Installation ...
Page 75: ...www johnsoncontrols com SM YOHC 12 60GB 03 07 ...