PART 3 – EXECUTION
3.01 INSTALLATION
A. General: Rig and Install in full accordance with Manufacturers requirements, Project
drawings, and Contract documents.
B. Location: Locate chiller as indicated on drawings, including cleaning and service main-
tenance clearance per Manufacturer instructions. Adjust and level chiller on support
structure. If equipment provided exceeds height of scheduled chiller, installing contrac-
tor is responsible for additional costs associated with extending the height of parapet
or screening walls/enclosures
C. Components: Installing Contractor shall provide and install all auxiliary devices and
accessories for fully operational chiller.
D. Electrical: Coordinate electrical requirements and connections for all power feeds with
Electrical Contractor.
E. Controls: Coordinate all control requirements and connections with Controls Contrac-
tor.
F.
Finish: Installing Contractor shall paint damaged and abraded factory finish with touch-
up paint matching factory finish.
Guide Specifications (Cont'd)
Summary of Contents for YCWL Series
Page 4: ...JOHNSON CONTROLS FORM 150 26 EG1 116 4 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 43: ...FORM 150 26 EG1 116 JOHNSON CONTROLS 43 Unit Dimensions Four Compressor Cont d ...
Page 45: ...FORM 150 26 EG1 116 JOHNSON CONTROLS 45 Unit Dimensions Five Six Compressor Cont d ...
Page 47: ...FORM 150 26 EG1 116 JOHNSON CONTROLS 47 Unit Dimensions SI Four Compressor Cont d ...
Page 49: ...FORM 150 26 EG1 116 JOHNSON CONTROLS 49 Unit Dimensions SI Five Six Compressor Cont d ...