background image

12

EE

GB

Installation Instructions

Inspection

Upon reception, inspect the merchandise
and notify both the carrier and the insurance
company, in writing, of any possible
damage.

Environmental protection

Packing

Packing is made of recyclable
material. Its eliminate should be
carried out in accordance with
the existing local regulations on

selective collection of residual material.

Elimination of the unit
Upon disassembly of the unit, its
components should be recuperated
ecologically. The cooling circuit contains
refrigerant which should be recovered and
returned to the gas manufacturer for
recycling.
Oil will remain in the sealed compressor
and, therefore, it must be returned with its
circuit sealed.
The air conditioning unit will be deposited
in an area established by the local
authorities, for its selective recuperation.

Safety

Installation and maintenance operations of
this air conditioning system should be
carried out only by qualified and expert
personnel. Per iodical maintenance
operations, such as cleaning the coils and
air filters, should be carried out so as to
keep unit performance at an optimum.

Caution

This unit should be installed
and used in accordance with:
-

Low Voltage Electrotechnical

Regulations.

- Safety Regulations for Cooling Plants and

Installations.

- Regulations on Pressure Equipment.

- Basic Construction Standards.

- Local ordinances

Transportation

The units should always be transported in
a vertical position so as to avoid oil leaking
out of the compressor. If, for any reason,
this position need be changed sporadically,
they will remain in that position a strictly
necessary period of time.

Handling

This unit should be handled by using the
metal rails supplied for fastening and
transportation.

Warning signs

The following signs indicate the presence
of possible dangerous conditions for the
users or maintenance personnel. When
found on the unit, their meaning should be
taken into account.

Fig. 1
This symbol indicates an electrical risk or
hazard.

Fig. 2
Caution: The unit is equipped with a remote
control system and can start automatically.
Before having access to the interior of the
unit, disconnect the power supply so as to
avoid any contact with the fan turbine in
motion.

Fig. 3

Caution: Fan in operation.

Fig. 4
Caution: It is obligatory to read the
instructions prior to any handling.

Fig. 5

Caution: Do not touch hot surfaces.

Fig. 6
Attention: Possible gas leaks due to
inadequate handling.

Location

Before locating the unit in place, check the
specifications described on same to be sure
you have received the adequate product.
The unit should be placed on a perfectly
horizontal plane, making sure the base can
support the weight of the unit.
If you want to insure the absence of
vibration, the unit can be placed on a cork
or similar antivibratory base, or fastened to
its base with antivibratory plates or
supports.
Figure 11 indicates the clearances and
fastening points for each model.

Fastening the unit

Before installing the unit, make sure the
structure can withstand the weight of same.
If the unit is placed on the floor, a concrete
base should be prepared so as to distribute
its weight evenly. See Fig. 7.

Clearances

The installation of each unit should have
clearances for:
a) Air intake and discharge.
b) Maintenance servicing.
c) Power supply connection.

For correct operation, always respect the
minimum distances indicated in the general
dimensions diagrams with regard to
possible obstructions of free air circulation
or maintenance servicing.

Wiring

Electrical connections

The  established national regulations
should be followed in all cases.
Each unit is supplied with a control box to
which the power supply will be connected
through a fused main switch or an automatic
switch.

Warning

Loose cables can produce
overheating of the terminals or an
incorrect operation of the unit. A
fire hazard may also exist.

Therefore, make sure all cables are
connected tightly.

Scroll compressors, rotational
direction

The Scroll compressors, just like the fans,
operate correctly in one single rotational
direction. When starting the equipment up,
make sure this rotational direction is correct.
If it is not correct:
- The compressor does not compress.
- It makes an unusual noise.
- Amp consumption is lower.
- It overheats.

Hydraulic connections

The hydraulic connections of the water
intake and outlet of the chiller should be
carried out respecting the intake and outlet
directions indicated.
Galvanised iron or copper tubing can be
use, with dimensions no lower than those
indicated, and keeping in mind the pressure
drops of said connections and of the
internal exchanger of the installation.
Pump dimensioning should be carried out
considering a nominal flow that allows an

t

 

within the operating limits.

In all cases, a flow switch should be installed
so as to avoid the possibility of operation
without water circulation.
An expansion vessel should be installed in
the water return tubing.
This vessel must be adequate for the total
water volume of the installation.
During the winter season, with outdoor
temperatures below 0°C, precautions
should be taken to avoid the water from
freezing in the tubing networks and inside
the exchanger.
Usual application is to fill the circuit with an
antifreeze mixture (glycol).

Summary of Contents for YCSA

Page 1: ...en con los relacionados en el Directorio EUROVENT de Productos Certificados en el programa AC1 AC2 y AC3 Clima Roca York S L is participating in the EUROVENT Certification Programme Products are as li...

Page 2: ...2 EE...

Page 3: ...ra siden 4 Entradaagua Water intake Entr e d eau Entrada de gua Entrataacqua Wassereintritt Waterinlaat Vanninntak 5 Salida agua Water outlet Sortie d eau Sa da de gua Uscita acqua Wasseraustritt Wate...

Page 4: ...ico m nimo Minimum technical clearance D gagements n cessaires Espa o t cnico m nimo Minimo spazio libero in mm Technischer Mindestabstand Minimale technische ruimte Minstetekniskeavstander 1000 1500...

Page 5: ...ion lectrique E Recharge eau 3 8 Gas F Notas A Entrada de gua 2 G s F B Sa da de gua de 2 G s F C Linhas auxiliares D Alimenta o el ctrica E Recarga de gua 3 8 G s F Note A Entrata acqua 2 Gas F B Usc...

Page 6: ...descritas en el exte rior del mismo de haber recibido el pro ducto adecuado La unidad debe colocarse apoyada en un plano perfectamente horizontal asegur n dose que la base pueda soportar el peso de la...

Page 7: ...Presi n est tica disponible certificaci n eurovent Unidades s lo frio 3 presi n con filtro limpio Unidades s lo frio Kit Hydro sol unidades versi n P 1 225 235 263 245 212 222 243 222 194 245 178 222...

Page 8: ...2 x 12 A 2x17 7 2x19 8 A 2 x 19 2 x 21 1 1Tandem Scroll Placas l h 8090 10820 l h 9560 10940 2 W 2x365 2x625 A 2x1 8 2x2 5 m3 h 14 000 17000 R 407C kg 16 23 Caracter sticas Capacidadcalor fica Capacid...

Page 9: ...SA H INSTALACI N EL CTRICA CLIENTE PLACA TERMINALES YCSA YCSA H PLACA TERMINALES EXTERNA INTERRUPTOR GENERAL TERMINAL SIN VOLTAJE PLACA ELECTRONICA A1 4 5 6 ALARMA GENERAL CONTACTO INVERSOR LIBRE DE T...

Page 10: ...TOMATICO PRESOSTATO BAJA REARME AUTOMATICO CONTACTOR COMPRESOR 1 CONTACTOR COMPRESOR 2 CONTACTOR BOMBA COMPRESORES 1 Y 2 VENTILADORES BOMBA PRESOSTATO DIFERENCIAL CIRCUITO AGUA INTERRUPTORES AUTOMATIC...

Page 11: ...B1 GND B2 B2 GND B3 SONDA SALIDA AGUA SONDA ENTRADA AGUA ID9 GND Y1 C ID10 ID11 GND Y2 3 2 1 P2 3 2 1 P1 3 2 1 P3 3 2 1 P4 3 2 1 P5 SONDAS NTC CONECTAR 1 2 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2...

Page 12: ...ure you have received the adequate product The unit should be placed on a perfectly horizontal plane making sure the base can support the weight of the unit If you want to insure the absence of vibrat...

Page 13: ...CSA H 1 These weights correspond to the unit empty 2 Available static pressure Eurovent certification Cool only units 3 Pressure with clean filter Cool only units Hydro Kit version P units only 1 225...

Page 14: ...2x10 2 2 x 12 A 2x17 7 2x19 8 A 2 x 19 2 x 21 1 1Tandem Scroll Plates l h 8090 10820 l h 9560 10940 2 W 2x365 2x625 A 2x1 8 2x2 5 m3 h 14 000 17000 R 407C kg 16 23 Characteristics Heatingcapacity Coo...

Page 15: ...YCSA YCSA H CONNECTING STRIP VOLT FREE CONTACT CLIENT WIRING YCSA YCSA H TERMINAL PLATE EXTERNAL TERMINAL PLATE MAIN SWITCH VOLT FREE TERMINAL ELECTRONIC PLATE A1 4 5 6 GENERAL ALARM VOLT FREE INVERT...

Page 16: ...THERMAL PROTECTOR COMPRESSOR 1 THERMAL PROTECTOR COMPRESSOR 2 W A T E R I N T A K E N T C P R O B E WATER OUTLET CIRCUIT 1 NTC PROBE FAN SPEED CONTROL COOLING TEMP COIL 1 NTC PROBE FAN SPEED CONTROL C...

Page 17: ...OUTLET PROBE WATER INTAKE PROBE ID9 GND Y1 C ID10 ID11 GND Y2 3 2 1 P2 3 2 1 P1 3 2 1 P3 3 2 1 P4 3 2 1 P5 NTC PROBE CONNECT 1 2 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2 ROO FS NC NO...

Page 18: ...de l emballage correspondent l appareil demand L appareil doit tre pos sur plan parfaitement horizontal et s assurer que la base peut supporter son poids Si l on souhaite s assurer de l absence de vib...

Page 19: ...e disponible certification Eurovent Unit s froid seul 3 Pression avec filtre propre Unit s froid seul Kit Hydro uniquement unit s version P 1 225 235 263 245 212 222 243 222 194 245 178 222 1350 1850...

Page 20: ...2 x 12 A 2x17 7 2x19 8 A 2 x 19 2 x 21 1 1Tandem Scroll Plaques l h 8090 10820 l h 9560 10940 2 W 2x365 2x625 A 2x1 8 2x2 5 m3 h 14 000 17000 R 407C kg 16 23 Caract ristiques Puissance calorifique Pui...

Page 21: ...SA YCSA H INSTALLATION LECTRIQUE CLIENT CARTE TERMINAUX YCSA YCSA H CARTE EXTERNE TERMINAUX INTERRUPTEUR G N RAL TERMINAUX HORS TENSION CARTE LECTRONIQUE A1 4 5 6 ALARME G N RALE CONTACT INVERSEUR HOR...

Page 22: ...E COMPRESSEUR 2 E N T R E E A U S O N D E N T C SORTIE EAU CIRC 1 SONDE NTC TEMP REFROID CONTR LE VITESSE VENTIL BATTERIE 1 SONDE NTC TEMP REFROID CONTR LE VITESSE VENTIL BATTERIE 2 SONDE NTC CONDENS...

Page 23: ...B2 GND B3 SONDE SORTIE EAU SONDE ENTR E EAU ID9 GND Y1 C ID10 ID11 GND Y2 3 2 1 P2 3 2 1 P1 3 2 1 P3 3 2 1 P4 3 2 1 P5 SONDES NTC CONNECTER 1 2 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30...

Page 24: ...ica es descritas na parte exterior do mesmo de ter recebido o produto adequado A unidade deve ser colocada em cima de um plano perfeitamente horizontal e h que certificar que a base pode aguentar o pe...

Page 25: ...certifica o eurovent Unidades de s frio 3 Press o com o filtro limpo Unidades de s frio Kit Hydro s nas unidades da vers o P 1 225 235 263 245 212 222 243 222 194 245 178 222 1350 1850 2 9 3 4 179 181...

Page 26: ...A 2x17 7 2x19 8 A 2 x 19 2 x 21 1 1Tandem Scroll Placas l h 8090 10820 l h 9560 10940 2 W 2x365 2x625 A 2x1 8 2x2 5 m3 h 14 000 17000 R 407C kg 16 23 Caracter sticas Capacidade calor fica Capacidadefr...

Page 27: ...H INSTALA O EL CTRICA DO CLIENTE PLACA DE TERMINAIS DA UNIDADE YCSA YCSA H PLACA DE TERMINAIS EXTERNA INTERRUPTOR GERAL TERMINAL SEM VOLTAGEM PLACA ELECTR NICA A1 4 5 6 ALARME GERAL CONTACTO DE INVER...

Page 28: ...ELOCIDADE FS CONTROLO DE CAUDAL FSC CONTROLO DA VELOCIDADE DO VENTILADOR HP PRESS STATO DE ALTA REARME AUTOM TICO LP PRESS STATO DE BAIXA REARME AUTOM TICO K1 DISPOSITIVO DE CONTACTO DO COMPRESSOR 1 K...

Page 29: ...ID6 ID7 B3 B1 SONDA DA BATERIA 1 GND B1 GND B2 B2 GND B3 SONDA DE SA DA DE GUA SONDA DE ENTRADA DE GUA ID9 GND Y1 C ID10 ID11 GND Y2 3 2 1 P2 3 2 1 P1 3 2 1 P3 3 2 1 P4 3 2 1 P5 SONDAS NTC LIGAR 1 2 2...

Page 30: ...llo stesso di aver ricevuto il prodotto adeguato L unit deve essere appoggiata su un piano perfettamente orizzontale dopo essersi accertati che la base ne possa sopportare il peso Per garantire l asse...

Page 31: ...ne Pressione massima dell unit Entrata di corrente massima nell unit Corrente all avviamento compressore Peso 1 Entrata di potenza massima nell unit Caratteristiche YCSA YCSA H YCSA YCSA H YCSA YCSA H...

Page 32: ...7 2x19 8 A 2 x 19 2 x 21 1 1Tandem Scroll Apiastra l h 8090 10820 l h 9560 10940 2 W 2x365 2x625 A 2x1 8 2x2 5 m3 h 14 000 17000 R 407C kg 16 23 Caratteristiche Resatermica Resa frigorifera Amperaggi...

Page 33: ...ELETTRICO DEL CLIENTE MORSETTIERA UNIT YCSA YCSA H MORSETTIERA ESTERNA INTERRUPTORE GENERALE CONTATTO SENZA TENSIONE SCHEDA ELETTRONICA A1 4 5 6 ALLARME GENERALE CONTATTO INVERTITORE PRIVO DI TENSIONE...

Page 34: ...COLAZIONE 1 SONDA NTC T E M P R E F R I G C O N T R O L L O VELOCIT VENTIL BATTERIA 1 SONDA NTC T E M P R E F R I G C O N T R O L L O VELOCIT VENTIL BATTERIA 2 SONDA NTC CONDENSATORI MOTOVENTILATORI F...

Page 35: ...2 GND B3 SONDA USCITA ACQUA SONDA ENTRATA ACQUA ID9 GND Y1 C ID10 ID11 GND Y2 3 2 1 P2 3 2 1 P1 3 2 1 P3 3 2 1 P4 3 2 1 P5 SONDE NTC COLLEGARE 1 2 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29...

Page 36: ...sen kommen Aufstellung Bevor das Ger t ausgepackt wird ist anhand der au en an der Verpackung angebrachten Beschriftung sicherzustellen dass auch tats chlich die richtige Einheit geliefert wurde Die E...

Page 37: ...ck Eurovent Zertifikat Einheiten Nur K hlen 3 Druck bei sauberem Filter Einheiten Nur K hlen Hydro Bausatz nur EinheitenVersion P 1 225 235 263 245 212 222 243 222 194 245 178 222 1350 1850 2 9 3 4 17...

Page 38: ...x9 2 2x11 1 kW 2x10 2 2 x 12 A 2x17 7 2x19 8 A 2 x 19 2 x 21 1 1Tandem Scroll Platten l h 8090 10820 l h 9560 10940 2 W 2x365 2x625 A 2x1 8 2x2 5 m3 h 14 000 17000 R 407C kg 16 23 Merkmale Heizleistun...

Page 39: ...YCSA YCSA H KLEMMENLEISTE YCSA YCSA H EXTERNE KLEMMENLEISTE HAUPTSCHALTER SPANNUNGSLOSE KLEMME ELEKTRONIKPLATINE A1 4 5 6 GENERALALARM SPANNUNGSFREIER INVERTERKONTAKT MAX 10 A WIDERST BEI 250 V 1 7 DU...

Page 40: ...L T S C H T Z V E R D I C H T E R 2 SCHALTSCH TZ PUMPE VERDICHTER 1 UND 2 VENTILATOREN PUMPE D I F F E R E N Z I A L D R U C K W C H T E R WASSERKREISLAUF AUTOMATISCHE UNTERBRECHER VERDAMPFERWIDERSTA...

Page 41: ...GND Y1 C ID10 ID11 GND Y2 3 2 1 P2 3 2 1 P1 3 2 1 P3 3 2 1 P4 3 2 1 P5 SENSOREN NTC ANSCHLIESSEN 1 2 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2 ROO FS NC NO C C NC NO C NO NC NO C NO C...

Page 42: ...elijke gaslekkage door een oneigenlijke handeling Plaats Alvorens het toestel op zijn plaats te zetten controleren of de specificaties op de buitenkant van de verpakking kloppen en u het juiste toeste...

Page 43: ...statische druk nominaal luchtdebiet zonder filter in verwarming Beschikbare statische druk nominaal luchtdebiet met filter in verwarming Verbruik pomp Verbruik pomp Waterinhoud in toestel Capaciteit...

Page 44: ...9 8 A 2 x 19 2 x 21 1 1Tandem Scroll Platen l h 8090 10820 l h 9560 10940 2 W 2x365 2x625 A 2x1 8 2x2 5 m3 h 14 000 17000 R 407C kg 16 23 Kenmerken Verwarmingsvermogen Koelvermogen Vermogen compressor...

Page 45: ...SA YCSA H ELEKTRISCHE INSTALLATIE KLANT PLAAT AANSLUITKLEMMEN YCSA YCSA H EXTERNE PLAAT AANSLUITKLEMMEN HOOFDSCHAKELAAR AANSLUITKLEM ZONDER SPANNING PRINTPLAAT A1 4 5 6 ALGEMEEN ALARM OMKEERCONTACT ZO...

Page 46: ...AT CIRCUIT 1 NTC VOELER KOELTEMPERATUUR REGELING VENTILATORSNELHEID BATTERIJ 1 NTC VOELER KOELTEMPERATUUR REGELING VENTILATORSNELHEID BATTERIJ 2 NTC VOELER CONDENSING UNITS DOOR MOTOR AANGEDREVEN VENT...

Page 47: ...1 GND B2 B2 GND B3 VOELER WATERUITLAAT VOELER WATERINLAAT ID9 GND Y1 C ID10 ID11 GND Y2 3 2 1 P2 3 2 1 P1 3 2 1 P3 3 2 1 P4 3 2 1 P5 NTC VOELERS 1 2 AANSLUITEN 12 13 14 15 16 17 18 19 20 21 22 23 24 2...

Page 48: ...ikre seg om at man har f tt riktig apparat ved sjekke spesifikasjonene p apparatets utside Enheten m plasseres p en helt vannrett overflate og man m f rst forsikre seg om at underlaget den skal settes...

Page 49: ...ponibelt statisk trykk eurovent sertifisering Enheter kun avkj ling 3 Trykk med rent filter Enheter kun avkj ling Kit Hydro kun enheter versjon P 1 225 235 263 245 212 222 243 222 194 245 178 222 1350...

Page 50: ...2 x 12 A 2x17 7 2x19 8 A 2 x 19 2 x 21 1 1Tandem Scroll Plater l h 8090 10820 l h 9560 10940 2 W 2x365 2x625 A 2x1 8 2x2 5 m3 h 14 000 17000 R 407C kg 16 23 Karakteristikker Varmekapasitet Kj lekapas...

Page 51: ...NTAKT KOPLINGSLIST YCSA YCSA H ELEKTRISK INSTALLASJON KUNDE YCSA YCSA H TILKOPLINGSPLATE YTRE TILKOPLINGSPLATE HOVEDBRYTER SPENNINGSFRI POLKLEMME ELEKTRONISK PLATE A1 4 5 6 HOVEDALARM SPENNINGSFRI VEK...

Page 52: ...EBESKYTTER KOMPRESSOR 2 VANNINNTAK SONDE NTC VANNUTL P KRETS 1 SONDE NTC A V K J L T E M P HASTIGHETSKONTROLL VIFTE BATTERI 1 SONDE NTC A V K J L T E M P HASTIGHETSKONTROLL VIFTE BATTERI 2 SONDE NTC K...

Page 53: ...GND B2 B2 GND B3 SONDE VANNUTL P SONDE VANNINNTAK ID9 GND Y1 C ID10 ID11 GND Y2 3 2 1 P2 3 2 1 P1 3 2 1 P3 3 2 1 P4 3 2 1 P5 SONDER NTC TILKOBLE 1 2 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28...

Page 54: ...54 EE...

Page 55: ...FICACIONES T CNICAS APLICADAS LUGAR Sabadell Espa a EN292 1 EN292 2 EN563 EN294 EN953 EN378 60335 1 60335 2 40 EN55014 1 EN55014 2 EN55104 98 37 EEC 73 23 EEC 89 336 EEC 97 23 EEC CEDECLARATIONOFCONFO...

Page 56: ...R Sabadell Espa a M dulo de evaluaci n D1 Organismo Notificado AENOR C G nova 6 28004 Madrid EN292 1 EN292 2 EN563 EN294 EN953 EN378 EN60204 1 EN50081 2 EN50082 2 98 37 EEC 73 23 EEC 89 336 EEC 97 23...

Reviews: