FORM 201.19-EG4
PART 3 — EXECUTION
3.01 INSTALLATION
A. General: Rig and Install in full accordance with
Manufacturer’s requirements, Project drawings, and
Contract documents.
B. Location: Locate chiller as indicated on drawings, in-
cluding cleaning and service maintenance clearance
per Manufacturer instructions. Adjust and level chiller
on support structure.
C. Components: Installing Contractor shall provide and
install all auxiliary devices and accessories for fully
operational chiller.
D. Electrical: Coordinate electrical requirements and
connections for all power feeds with Electrical Con-
tractor (Division 16).
E. Controls: Coordinate all control requirements and
connections with Controls Contractor.
F. Finish: Installing Contractor shall paint damaged and
abraded factory finish with touch-up paint matching
factory finish.
Summary of Contents for R-407C Optimized
Page 91: ...91 YORK INTERNATIONAL FORM 201 19 EG4 This page intentionally left blank...
Page 110: ...110 YORK INTERNATIONAL Typical Control Wiring 2 Compressor...
Page 118: ...118 YORK INTERNATIONAL This page intentionally left blank...
Page 119: ...119 YORK INTERNATIONAL FORM 201 19 EG4 This page intentionally left blank...