background image

036-21636-002 Rev. A (1205)

Unitary Products Group

3

Annual Fuel Utilization Efficiency (AFUE) numbers are determined in accordance with DOE Test procedures.
Wire size and over current protection must comply with the National Electrical Code (NFPA-70-latest edition) and all local codes.
The furnace shall be installed so that the electrical components are protected from water.
* Wire size and overcurrent protection must comply with the National Electric Code.

NOTES: 

1. For altitudes above 2000 ft. reduce capacity 4% for each 1000 ft. above sea level.
2. Wire size based on copper conductors, 60°C, 3% voltage drop.
3. Continuous return air temperature must not be below 55°F.
4. All filters must be high velocity cleanable type.

ELECTRICAL AND PERFORMANCE DATA

Models

Input

(High/Low)

Output

(High/Low)

Nominal 

Airflow

Cabinet 

Width

Total Unit

AFUE

Air Temp. 

Rise

MBH

MBH

CFM

In.

Amps

%

°F

PV9B12N060DH11

60 / 39

56 / 36 

1200

17-1/2

9

92

35 - 65

PV9B12N080DH11

80 / 52

75 / 49

1200

17-1/2

9

92

35 - 65

PV9C16N080DH11

80 / 52

75 / 49

1600

21

12

92

35 - 65

PV9C20N100DH11

100 / 65

93 / 61

2000

21

14

92

35 - 65

PV9D20N120DH11

120 / 78

112 / 74

2000

24-1/2

14

92

35 - 65

Models

Input

(High/Low)

Max. Outlet 

Air Temp.

Blower

Blower 

Size

Max. 

Over-current 

Protect

Min. Wire Size *

(awg) @ 75 ft. 

One Way

Operating 

Wgt.

MBH

°F

HP

Amps

In.

Lbs.

PV9B12N060DH11

60 / 39

165

1/2

7.0

11 x 8

20

14

136

PV9B12N080DH11

80 / 52

165

1/2

7.0

11 x 8

20

14

143

PV9C16N080DH11

80 / 52

165

3/4

10.2

11 x 10

20

14

159

PV9C20N100DH11

100 / 65

165

1

12.7

11 x 11

20

12

164

PV9D20N120DH11

120 / 78

165

1

12.7

11 x 11

20

12

182

Summary of Contents for PV9 Series

Page 1: ...e Two stage inducer operation Provides increased comfort level very quiet unit opera tion Adjustable delay timer allows two stage operation with sin gle stage thermostat Compact easy to install ideal height 40 cabinet Blower off delay for cooling SEER improvement Easy to connect power control wiring Built in high level self diagnostics with fault code display Low unit amp requirement for easy repl...

Page 2: ...HOLE 7 8 29 22 3 4 21 1 4 18 1 2 9 1 8 8 1 2 30 1 8 23 11 16 E FRONT A 40 DIMENSIONS Models Nominal CFM Cabinet Size Cabinet Dimension A in B in C in D in E IN PV9B12N060DH11 1200 B 17 1 2 16 1 4 15 1 3 4 2 3 8 PV9B12N080DH11 1200 B 17 1 2 16 1 4 15 1 3 4 2 3 8 PV9C16N080DH11 1600 C 21 19 3 4 18 1 2 2 1 8 2 3 4 PV9C20N100DH11 2000 C 21 19 3 4 18 1 2 2 1 8 2 3 4 PV9D20N120DH11 2000 D 24 1 2 23 1 4 ...

Page 3: ...4 All filters must be high velocity cleanable type ELECTRICAL AND PERFORMANCE DATA Models Input High Low Output High Low Nominal Airflow Cabinet Width Total Unit AFUE Air Temp Rise MBH MBH CFM In Amps F PV9B12N060DH11 60 39 56 36 1200 17 1 2 9 92 35 65 PV9B12N080DH11 80 52 75 49 1200 17 1 2 9 92 35 65 PV9C16N080DH11 80 52 75 49 1600 21 12 92 35 65 PV9C20N100DH11 100 65 93 61 2000 21 14 92 35 65 PV...

Page 4: ... C A 1287 772 D A 1337 802 C C 1132 668 D C HIGH LOW HEAT CFM WITHOUT FILTERS 60 000 INPUT 3 Ton 80 000 INPUT 3 Ton JUMPER SETTINGS CFM CFM High Low High Low HEAT Tap ADJ Tap 1137 720 1386 962 A Any 974 625 1322 892 B Any 883 593 1250 849 C Any 825 561 1159 768 D Any 80 000 INPUT 4 Ton 100 000 INPUT 5 Ton JUMPER SETTINGS CFM CFM High Low High Low HEAT Tap ADJ Tap 1732 1173 1912 1237 A Any 1631 111...

Page 5: ...of return air openings or return air opening size and add to the ESP from Step 2 to determine the total system static If total system static matches a ESP value in the airflow table i e 0 20 0 60 etc the system airflow corresponds to the intersection of the ESP column and Model Blower Speed row FILTER SIZES Input Output BTU H CFM Cabinet Size Top Return Filter in 60 56 1200 B 2 14 x 20 80 75 1200 ...

Page 6: ...ight O Reversing Valve Energized in Cool TWO STAGE AIR CONDITIONING Comfort Alert Interface HUM Dehumidification Open on Humidity Rise C 24 Volt Common C 24 Volt Common R 24 Volt Hot W2 Second Stage Heat G Fan Y2 Second Stage Cool E W1 First Stage Heat RC 24 Volt Hot Cool XFMR Y1 First Stage Cool R 24 Volt Hot Y Y2 Single Second Stage Cool Y2 Second Stage Cool Y First Stage Cool Y2 Second Stage Co...

Page 7: ...2 Delay on furnace to OFF HM Humidistat BSG Bonnet Sensor Bonnet Sensor Optional BS Bonnet Sensor AUX Auxiliary Heat E W1 First Stage Auxiliary Heat E W1 First Stage Auxiliary Heat W Auxiliary Heat Y2 Second Stage Heat Cool DHM Dehumidistat HUM Dehumidification Open on Humidity Rise Y2 Second Stage Heat Cool Y2 Second Stage Heat Cool Y2 Second Stage Heat Cool Y 2 O Reversing Valve Energized in Coo...

Page 8: ...K0924 24 1 2 Furnace Required in downflow applications when using G FD series coils CONDENSATE NEUTRALIZER KIT 1NK0301 Neutralizer cartidge has a 1 2 plastic tube fittings for installa tion in the drain line Calcium carbonate refill media is also avaiable from the Source 1 Parts p n 026 30228 000 HIGH ALTITUDE PRESSURE SWITCHES For installation where the altitude is less than 8 000 feet it is not ...

Reviews: