036-21606-001 Rev. A (0804)
2
Unitary Products Group
A
40
26-3/4
1-3/8
1-1/4
C
20
5/8
5/8
B
24-3/4
FRONT
BOTTOM IMAGE
RETURN END
TOP IMAGE
SUPPLY END
LEFT SIDE
RIGHT SIDE
D
20
30-1/8
14-3/4
5-3/8
(VENT CONNECTIONS)
POWER WIRING
7/8” HOLE
2-1/2
ACCESS
WIRING
7/8” K.O.
16
8-3/4
T’STAT WIRING
7/8” K.O.
1-1/8
2-1/4
14
23-1/2
32-1/2
2
13-3/4
GAS INLET
1-1/4 x 2-1/2
D
4” Diameter
CABINET AND DUCT DIMENSIONS
MODEL
CFM
Cabinet
Size
Cabinet Dimension
A
B
C
D
PV8A12(N,L)080UH11
1200
A
14 1/2
13 1/4
10 1/8
10 1/8
PV8B16(N,L)100UH11
1600
B
17 1/2
16 1/4
15 1/4
11 5/8
PV8C20(N,L)100UH11
2000
C
21
19 3/4
16 5/8
13 3/8
PV8C20(N,L)120UH11
2000
C
21
19 3/4
16 5/8
13 3/8
HORIZONTAL VENTING-MUST USE FIELDS CONTROL MODELS SWG-4Y OR TJERENLAND MODEL GPAK-JT FIELD
SUPPLIED POWER VENTING KITS
Heating Input
Heating Input
Furnace Airflow
Horizontal Vent Length Ft with 4 Elbows
Pipe Size
Min. Vent Length
Max. Vent Length
BTU/H
BTU/H
CFM
Inches
Feet
Feet
80,000
64,000
1200
4
4.5
34.5
100,000
80,000
1600
4
4.5
34.5
100,000
80,000
2000
4
4.5
34.5
120,000
104,000
2000
4
4.5
34.5