6
FLOOR/CEILING
YORK MINISPLIT FLOOR/CEILING
PREPARATION BEFORE INSTALLATION
• Before doing any work, check the interior power supply cord and the main breaker capacity are sufficient and the
installation area is sufficient and complies with the requirements.
• Check that the power supply available agrees with nameplate voltage.
• Electrical work, wiring and cables must be performed in compliance with national and local wiring codes and
standard.
• Do not use the extension cables. In the case extended cables are needed, use the terminal block.
SELECTION OF THE LOCATION
■
Select a place which provides the space around the units as shown in the
diagram below.
Indoor Unit
Outdoor Unit
Dimension
PCC
(cm)
12
18
24
36
48
60
A
50
50
50
50
50
50
B
80
80
80
80
80
80
C
5
5
5
5
5
5
D
20
20
20
20
20
20
Dimension
POC
(cm)
12
18
24
36
48
60
A
40
40
40
40
40
40
B
20
20
20
20
20
20
C
20
20
20
20
20
20
D
60
60
60
60
60
60