FLOOR/CEILING
3
YORK MINISPLIT FLOOR/CEILING
REQUIRED TOOLS
1. Screw Driver
2. Hexagonal Wrench
3. Torque Wrench
4. Spanner
5. Reamer
6. Hole Core Drill
7. Tape Measure
8. Thermometer
9. Manifold Guage
10. Gas Leak Detector
11. Vacuum Pump
12. Pipe Clamp
13. Pipe Cutter
14. Flare Tool Set
15. Electrical Circuit Tester
EXTENDED PARTS
1. Refrigerant Pipe
Models
PCC/POC
12
18
24
36
48
60
Liquid size
1/4"
3/8"
3/8"
3/8"
3/8"
3/8"
Gas size
1/2"
5/8"
5/8"
5/8"
3/4"
3/4"
2. Pipe Insulation Material (Polyethylene foam
9 mm thick)
3. Vinyl Tape
4. Putty
02_install.p65
14/3/02, 10:55
3
Summary of Contents for PCC 112
Page 17: ...03_install p65 14 3 02 10 57 17...
Page 18: ...03_install p65 14 3 02 10 57 18...