PRECAUTIONS DURING BRAZING OF LINES

All outdoor unit and evaporator coil connections are copper-to-copper
and should be brazed with a phosphorous-copper alloy material such
as Silfos-5 or equivalent. DO NOT use soft solder. The outdoor units
have reusable service valves on both the liquid and vapor connections.
The total system refrigerant charge is retained within the outdoor unit
during shipping and installation. The reusable service valves are pro-
vided to evacuate and charge per this instruction.

Serious service problems can be avoided by taking adequate precau-
tions to assure an internally clean and dry system.

PRECAUTIONS DURING BRAZING SERVICE VALVE

Precautions should be taken to prevent heat damage to service valve
by wrapping a wet rag around it as shown in Figure 5. Also, protect all
painted surfaces, insulation, and plastic base during brazing. After braz-
ing cool joint with wet rag.

Valve can be opened by removing the plunger cap and fully inserting a
hex wrench into the stem and backing out counter-clockwise until valve
stem just touches the chamfered retaining wall.

Connect the refrigerant lines using the following procedure:

1.

Remove the cap and Schrader core from both the liquid and vapor
service valve service ports at the outdoor unit. Connect low pres-
sure nitrogen to the liquid line service port.

2.

Braze the liquid line to the liquid valve at the outdoor unit. Be sure
to wrap the valve body with a wet rag. Allow the nitrogen to con-
tinue flowing. Refer to the Tabular Data Sheet for proper liquid line
sizing.

3.

Carefully remove the rubber plugs from the evaporator liquid and
vapor connections at the indoor coil.

4.

Braze the liquid line to the evaporator liquid connection. Nitrogen
should be flowing through the evaporator coil.

5.

Slide the grommet away from the vapor connection at the indoor
coil. Braze the vapor line to the evaporator vapor connection. After
the connection has cooled, slide the grommet back into original
position. Refer to the Tabular Data Sheet for proper vapor line siz-
ing.

6.

Protect the vapor valve with a wet rag and braze the vapor line
connection to the outdoor unit. The nitrogen flow should be exiting
the system from the vapor service port connection. After this con-
nection has cooled, remove the nitrogen source from the liquid fit-
ting service port.

7.

Replace the Schrader core in the liquid and vapor valves.

8.

Go to “SECTION IV” for TXV installation.

9.

Leak test all refrigerant piping connections including the service
port flare caps to be sure they are leak tight. DO NOT OVER-
TIGHTEN (between 40 and 60 inch - lbs. maximum).

10. Evacuate the vapor line, evaporator, and the liquid line to 500

microns or less.

NOTE: 

Line set and indoor coil can be pressurized to 250 psig with dry

nitrogen and leak tested with a bubble type leak detector. Then release
the nitrogen charge.

NOTE: 

Do not use the system refrigerant in the outdoor unit to purge or

leak test.

11.

Replace cap on service ports. Do not remove the flare caps from
the service ports except when necessary for servicing the system.

 Dry nitrogen should always be supplied through the tubing while it
is being brazed, because the temperature is high enough to cause
oxidation of the copper unless an inert atmosphere is provided. The
flow of dry nitrogen should continue until the joint has cooled.
Always use a pressure regulator and safety valve to insure that only
low pressure dry nitrogen is introduced into the tubing. Only a small
flow is necessary to displace air and prevent oxidation.

This is not a backseating valve. The service access port has a
valve core. Opening or closing valve does not close service access
port.
If the valve stem is backed out past the chamfered retaining wall,
the O-ring can be damaged causing leakage or system pressure
could force the valve stem out of the valve body possibly causing
personal injury.

 FIGURE 4: 

Heat Protection

The evaporator is pressurized.

Summary of Contents for HC3A SERIES

Page 1: ...ry It is also used to alert against unsafe practices and hazards involving only property dam age Improper installation may create a condition where the operation of the product could cause personal in...

Page 2: ...to be installed on a hot sun exposed roof or a black topped ground area the unit should be raised sufficiently above the roof or ground to avoid taking the accumulated layer of hot air into the outdo...

Page 3: ...stalling tubing of longer lengths and elevation differences NOTE Using a larger than specified line size could result in oil return problems Using too small a line will result in loss of capacity and...

Page 4: ...coil Braze the vapor line to the evaporator vapor connection After the connection has cooled slide the grommet back into original position Refer to the Tabular Data Sheet for proper vapor line siz ing...

Page 5: ...se soft solder Install the TXV bulb to the vapor line near the equalizer line using the two bulb clamps furnished with the TXV assembly Ensure the bulb is making maximum contact Refer to TXV installat...

Page 6: ...ON CONTROL A dehumidification control accessory 2HU06700124 may be used with variable speed air handlers or furnaces in high humidity areas This control works with the variable speed indoor unit to pr...

Page 7: ...r W Auxiliary Heat BS Bonnet Sensor BSG Bonnet Sensor YORKGUARD VI CONTROL SINGLE STAGE HEAT PUMP 1 H 3 YMB YZB OD MODELS Part Numbers SAP Legacy 126768 031 09137 18395 031 01996 340512 031 09178 1 C...

Page 8: ...E Emergency Heat W2 Second Stage Heat B O Switch on Thermostat must be in the O position C 24 Volt Common Y1 First Stage Compressor O B Reversing Valve L Malfunction Light Y2 Second Stage Compressor G...

Page 9: ...the O position C 24 Volt Common Y1 First Stage Compressor O B Reversing Valve L Malfunction Light Y2 Second Stage Compressor G Fan DN22U00124 THERMOSTAT E Emergency Heat AUX Auxiliary Heat R 24 Volt...

Page 10: ...mergency Heat W2 Second Stage Heat B O Switch on Thermostat must be in the O position C 24 Volt Common Y1 First Stage Compressor O B Reversing Valve L Malfunction Light Y2 Second Stage Compressor G Fa...

Page 11: ...must be in the O position C 24 Volt Common Y1 First Stage Compressor O B Reversing Valve L Malfunction Light Y2 Second Stage Compressor G Fan DN22U00124 THERMOSTAT E Emergency Heat AUX Auxiliary Heat...

Page 12: ...ls the following subcooling charging method must be used Superheat charging charts are not valid with TXV equipped systems Subcooling Charging Method For the heating operation there is no accurate sub...

Page 13: ...ed with a crankcase heater to prevent the migration of refrigerant to the compressor during the OFF cycle The heater is energized only when the unit is not running If the main switch is disconnected f...

Page 14: ...e Printed in U S A 361813 UIM A 0208 Copyright by Unitary Products Group 2008 All rights reserved Supersedes 170761 UIM D 1106 Unitary 5005 Norman Product York OK Group Drive 73069 SECTION X WIRING DI...

Reviews: