background image

105561-UIM-B-0605

Unitary Products Group

15

 

COMBUSTION AIR SUPPLY

All installations must comply with Section 5.3, Air for Combustion and
Ventilation of the National Fuel Gas Code, ANSI Z223.1 or Sections
7.2, 7.3 or 7.4 of CAN/CGA B149.1 or .2 Installation Code - latest edi-
tions.

This furnace is certified to be installed with one of three possible com-
bustion air intake configurations.

1.

OUTDOOR COMBUSTION AIR: This is a sealed combustion air
configuration where the combustion air is supplied through a PVC
or ABS pipe that is connected to the PVC coupling attached to the
burner box and is terminated in the same atmospheric zone as the
vent. This type of installation is approved on all models. Refer to
Figure 19.

2.

AMBIENT COMBUSTION AIR: Combustion air is supplied from
the area surrounding the furnace through vents or knockouts in the
furnace casing. The combustion air and the vent pipes are not ter-
minated in the same atmospheric zone. Refer to Figure 13 for vent
terminations. Refer to “AIR SOURCE FROM INSIDE THE BUILD-
ING” and “VENT AND SUPPLY AIR SAFETY CHECK” for proper
installation. Refer to Figure 20.

3.

VENTILATED COMBUSTION AIR: Combustion air is supplied
through a PVC or ABS pipe that is connected to the PVC coupling
attached to the burner box and is terminated in a ventilated attic or
crawl space. The combustion air and the vent pipes are not termi-
nated in the same atmospheric zone. Refer to Figure 22 for attic
and crawl space termination. Only the combustion air intake may
terminate in the attic. The vent must terminate outside.

Outdoor Combustion Air

Combustion Air Intake/Vent Connections

This installation requires combustion air to be brought in from outdoors.
This requires a properly sized pipe (Shown in Figure 19) that will bring
air in from the outdoors to the furnace combustion air intake collar on
the burner box. The second pipe (Shown in Figure 19) is the furnace
vent pipe.

The combustion air intake pipe should be located either through the
wall (horizontal or side vent) or through the roof (vertical vent). Care
should be taken to locate side vented systems where trees or shrubs
will not block or restrict supply air from entering the terminal.

Also, the terminal assembly should be located as far as possible from a
swimming pool or a location where swimming pool chemicals might be
stored. Be sure the terminal assembly follows the outdoor clearances
listed in Section #1 “Outdoor Air Contaminants.”

Ambient Combustion Air Supply

This type installation will draw the air required for combustion from
within the space surrounding the appliance and from areas or rooms
adjacent to the space surrounding the appliance. This may be from
within the space in a non-confined location or it may be brought into the
furnace area from outdoors through permanent openings or ducts. It is
not piped directly into the burner box. A single, properly sized pipe from
the furnace vent connector to the outdoors must be provided. For
upflow models combustion air is brought into the furnace through the
unit top panel opening. Do not install a pipe into the intake collar on top
of the burner box. Refer to Figure 20.

 FIGURE 16:  Double Horizontal Sealed Combustion Air and Vent 

Termination

 FIGURE 17:  Double Vertical Sealed Combustion Air and Vent 

Termination

VENT

2”

COMBUSTION AIR

6”

 FIGURE 18:  Sealed Combustion Air Intake Connection and Vent 

Connection

 FIGURE 19:  Combustion Airflow Path Through The Furnace Casing

CONNECTS TO
COLLAR ON TOP
OF BURNER BOX

VENT PIPE CEMENTS
INTO SOCKET JUST
ABOVE TOP PANEL

OR VENT PIPE MAY
BE CLAMPED INTO
OUTLET OF DRAIN
COUPLING

VENT PIPE CEMENTS
INTO SOCKET JUST
ABOVE TOP PANEL

COMBUSTION AIR

OR VENT PIPE MAY
BE CLAMPED INTO
OUTLET OF DRAIN
COUPLING

Summary of Contents for GF9S

Page 1: ...6 GAS PIPING 6 ELECTRICAL POWER 8 TWINNING AND STAGING 9 COMBUSTION AIR AND VENT SYSTEM 11 CONDENSATE PIPING 18 SAFETY CONTROLS 18 START UP AND ADJUSTMENTS 19 WIRING DIAGRAM 25 LIST OF FIGURES Dimens...

Page 2: ...plate and power supply to be sure that the elec trical characteristics match All models use nominal 115 VAC 1 Phase 60 Hertz power supply DO NOT CONNECT THIS APPLI ANCE TO A 50 HZ POWER SUPPLY OR A VO...

Page 3: ...required for servicing and cleaning 2 Eighteen 18 inches 46 cm at the side where access is required for passage to the front when servicing or for inspection or replacement of flue vent connections In...

Page 4: ...s properly sized as well 1 The Air Temperature Rise is determined by subtracting the Return Air Temperature Reading from the Supply Air Temperature Read ing 2 The External Static Pressure is determine...

Page 5: ...igure 1 for unit and plenum dimensions Attic installations must meet all minimum clearances to combustibles and have floor support with required service accessibility The supply air temperature MUST N...

Page 6: ...the instructions in this section specify the type of gas approved for this furnace only use those approved gases The installation of a drip leg and ground union is required Refer to Figure 4 IMPORTANT...

Page 7: ...ing a wrench to the body of the gas valve will damage the valve causing improper operation and or the valve to leak TABLE 5 High Altitude Conversion 40 120 MBTUH Models Type Of Gas Orifice at Sea Leve...

Page 8: ...ernate wiring method is to use a field provided 2 5 08 cm x 4 10 2 cm box and cover on the outside of the furnace Route the furnace leads into the box using a protective bushing where the wires pass t...

Page 9: ...n two furnaces are installed using the same duct system it is very important that the two furnace cir culating air blowers operate in unison If one blower starts before the second blower the duct syst...

Page 10: ...will shut off at the same time Continuous Fan On a thermostat call for continuous fan G signal both furnace blowers will come on at the same time in cooling speed and will stay on until the G signal...

Page 11: ...maximum of 5 elbows in the combustion air piping and a maximum of 5 elbows in the vent piping 4 Three vent terminal elbows two for vent pipe and one for air intake pipe are already accounted for as v...

Page 12: ...rom the furnace to the out side termination B Ventilated combustion air systems from the furnace to the attic or crawl space termination 6 Disassemble the combustion air and vent piping apply cement p...

Page 13: ...0 kW 36 inches 91 cm for models 100 000 BTUH 30 kW Two pipe direct vent applications 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW Single pipe applications 4...

Page 14: ...ombustion air systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 14 or 15 VENTING MULTIPLE UNITS Multiple units can be installed...

Page 15: ...ll bring air in from the outdoors to the furnace combustion air intake collar on the burner box The second pipe Shown in Figure 19 is the furnace vent pipe The combustion air intake pipe should be loc...

Page 16: ...e louver is in the fully open position This type of installation requires that the supply air to the appli ance s be of a sufficient amount to support all of the appliance s in the area Operation of a...

Page 17: ...sage Follow all notes procedures and required materials in the SEALED COMBUS TION AIR SUPPLY section in these instructions when installing the combustion air pipe from the unit and into a ventilated a...

Page 18: ...p pump must be approved for use with acidic condensate CONDENSATE DRAIN TRAP AND DRAIN FREEZE PROTECTION Special precautions MUST be made if installing furnace in an area which may drop below freezing...

Page 19: ...th x 1 8 0 3 cm diameter tubing 2 pieces of 4 10 cm length x 1 8 0 3 cm diameter tubing 1 5 16 0 8 cm tee 1 5 16 0 8 cm x 1 8 0 3 cm reducing coupling 1 1 8 0 3 cm adapter 1 Dwyer Manometer These item...

Page 20: ...3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 15 times 0 10 m3 of gas measured at the...

Page 21: ...l reference atmo spheric pressure Refer to Figure 26 for connection details IMPORTANT The cap for the pressure regulator must be removed entirely to gain access to the adjustment screw Loosening or ti...

Page 22: ...ning the jumper on two of the four pins as shown in Figure 27 The blower speed connections shown in Figure 27 are typical How ever these connections may vary from model to model and may be changed as...

Page 23: ...35 1175 33 1105 31 1045 30 990 28 905 25 890 25 790 22 80 1600 C 100 1600 C HIGH 1960 56 1955 55 1925 55 1890 54 1830 52 1765 50 1695 48 1615 46 1600 45 1485 42 M HI 1565 44 1560 44 1560 44 1575 45 15...

Page 24: ...that total system static is 0 58 w c To determine the system airflow complete the follow ing steps Obtain the airflow values at 0 50 w c 125 Pa 0 60 w c 150 Pa ESP Airflow 0 50 2285 CFM 64 70 m3 min A...

Page 25: ...105561 UIM B 0605 Unitary Products Group 25 SECTION XI WIRING DIAGRAM FIGURE 27 Wiring Diagram...

Page 26: ...105561 UIM B 0605 26 Unitary Products Group NOTES...

Page 27: ...105561 UIM B 0605 Unitary Products Group 27 NOTES...

Page 28: ...o change without notice Printed in U S A 105561 UIM B 0605 Copyright by York International Corp 2005 All rights reserved Supersedes 105561 UIM A 0205 Unitary 5005 Norman Product York OK Group Drive 73...

Reviews: