background image

105561-UIM-B-0605

10

Unitary Products Group

GAS PIPING

Furnace gas supplies must be provided as specified with these instruc-
tions. Since the furnaces are side by side, with no space between, gas
supplies must enter on the right and left respectively. All gas piping
must be in accordance with the national fuel gas code, ANSI Z223.1,
latest edition, and/or all local code or utility requirements.

TWINNING

In applications where more heating capacity or more airflow capacity is
needed than what one furnace can deliver, twinning can be used to
make two furnaces operate in tandem, using one duct system and one
room thermostat. When one duct system is used for two furnaces, it is
necessary that the two blowers operate in unison. The twinning function
of the board in this furnace ensures that both blowers turn on and off
simultaneously, and operate on the same blower speed.

Single-Wire Twinning

The control in the furnace has the single-wire twinning feature. With this
feature, a single wire is connected between the TWIN terminal on one
furnace board to the TWIN terminal on the second furnace board. The
board then communicates the blower status from one furnace to the
other along this wire. This communication makes the second furnace
blower come on at the same time, and on the same speed, as the first
furnace blower.

Single-Wire Twinning Instructions

Connect the control wiring as shown in Figure 10. 

1.

Connect the low voltage wiring from the wall thermostat to the ter-
minal strip on the control board of Furnace #1.

2.

Connect a wire from the TWIN terminal of Furnace #1 to the TWIN
terminal of Furnace #2.

3.

Install a separate 24V relay as shown in the diagram below. Use of
this relay is required, as it ensures that the transformers of the two
furnaces are isolated, thus preventing the possibility of any safety
devices being bypassed.

Single-Wire Twinning Operation

Heating - On a call for heat (W signal) from the wall thermostat, both
furnaces will start the ignition sequence and the burners on both fur-
naces will light. About thirty seconds after the burners light, the blowers
on both furnaces will come on in heating speed. When the thermostat is
satisfied, the burners will all shut off and, after the selected blower off
delay time, both blowers will shut off at the same time. The twinning
control ensures that both blowers come on and shut off at the same
time. 

Cooling - On a call for cooling (Y signal) from the wall thermostat, both
furnace blowers will come on at the same time in cooling speed. When
the thermostat is satisfied, both blowers will stay on for 60 seconds,
then will shut off at the same time. 

Continuous Fan - On a thermostat call for continuous fan (G signal),
both furnace blowers will come on at the same time in cooling speed
and will stay on until the G signal is removed.

STAGING

In applications where more heating capacity or more airflow capacity is
needed than what one furnace can deliver, twinning can be used to
make two furnaces operate in tandem, using one duct system and one
room thermostat. This control can also be used along with a two-stage
wall thermostat to stage two twinned furnaces, making them operate
like a single two-stage furnace. This allows only one furnace to supply
heat during times when the heat output from one furnace is sufficient to
satisfy the demand. When one duct system is used for two furnaces, it
is necessary that the two blowers operate in unison. The twinning func-
tion of this board ensures that both blowers turn on and off simulta-
neously, and operate on the same blower speed. Even when only one
furnace is supplying heat, both furnace blowers must run.

Single-Wire Staging

The single-wire twinning feature of this board can also be used for stag-
ing of two furnaces. With this feature, a single wire is connected
between the TWIN terminal on one furnace board to the TWIN terminal
on the second furnace board. The board then communicates the blower
status from one furnace to the other along this wire. This communica-
tion makes the second furnace blower come on at the same time, and
on the same speed, as the first furnace blower. 

Single-Wire Staging Instructions

Connect the control wiring as shown in the Figure 11. 

1.

Connect the low voltage wiring from the wall thermostat to the ter-
minal strip on the control board of Furnace #1. For staging applica-
tions, the wire from thermostat W1 is connected to the W
connection on the board on Furnace #1. The wire from thermostat
W2 is connected to Furnace #2 through a separate relay, as
described below.

2.

Connect a wire from the TWIN terminal of Furnace #1 to the TWIN
terminal of Furnace #2.

3.

Install a separate 24V relay as shown in the diagram below. Use of
this relay is required, as it ensures that the transformers of the two
furnaces are isolated, thus preventing the possibility of any safety
devices being bypassed.

If a return duct is connected to only one furnace (with a connection
between the two furnaces) an imbalance in the airflow will occur
and the furnace furthest from the return plenum will overheat.

 FIGURE 9:  Typical Twinned Furnace Application

COMBUSTION
AIR PIPES

VENT PIPE

ELECTRICAL
SUPPLY

GAS SUPPLY
(BOTH SIDES)

1 COIL FOR
EACH FURNACE

COMMON

RETURN

PLENUM

RETURN
AIR

 FIGURE 10:  Single Stage Twinning Wiring Diagram

W

G

C

R

Y/Y2

TWIN

TO A/C

W

G

R

Y

ISOLATION

RELAY

FURNACE 2 CONTROL BOARD

W

G

C

R

Y/Y2

TWIN

FURNACE 1 CONTROL BOARD

Summary of Contents for GF9S

Page 1: ...6 GAS PIPING 6 ELECTRICAL POWER 8 TWINNING AND STAGING 9 COMBUSTION AIR AND VENT SYSTEM 11 CONDENSATE PIPING 18 SAFETY CONTROLS 18 START UP AND ADJUSTMENTS 19 WIRING DIAGRAM 25 LIST OF FIGURES Dimens...

Page 2: ...plate and power supply to be sure that the elec trical characteristics match All models use nominal 115 VAC 1 Phase 60 Hertz power supply DO NOT CONNECT THIS APPLI ANCE TO A 50 HZ POWER SUPPLY OR A VO...

Page 3: ...required for servicing and cleaning 2 Eighteen 18 inches 46 cm at the side where access is required for passage to the front when servicing or for inspection or replacement of flue vent connections In...

Page 4: ...s properly sized as well 1 The Air Temperature Rise is determined by subtracting the Return Air Temperature Reading from the Supply Air Temperature Read ing 2 The External Static Pressure is determine...

Page 5: ...igure 1 for unit and plenum dimensions Attic installations must meet all minimum clearances to combustibles and have floor support with required service accessibility The supply air temperature MUST N...

Page 6: ...the instructions in this section specify the type of gas approved for this furnace only use those approved gases The installation of a drip leg and ground union is required Refer to Figure 4 IMPORTANT...

Page 7: ...ing a wrench to the body of the gas valve will damage the valve causing improper operation and or the valve to leak TABLE 5 High Altitude Conversion 40 120 MBTUH Models Type Of Gas Orifice at Sea Leve...

Page 8: ...ernate wiring method is to use a field provided 2 5 08 cm x 4 10 2 cm box and cover on the outside of the furnace Route the furnace leads into the box using a protective bushing where the wires pass t...

Page 9: ...n two furnaces are installed using the same duct system it is very important that the two furnace cir culating air blowers operate in unison If one blower starts before the second blower the duct syst...

Page 10: ...will shut off at the same time Continuous Fan On a thermostat call for continuous fan G signal both furnace blowers will come on at the same time in cooling speed and will stay on until the G signal...

Page 11: ...maximum of 5 elbows in the combustion air piping and a maximum of 5 elbows in the vent piping 4 Three vent terminal elbows two for vent pipe and one for air intake pipe are already accounted for as v...

Page 12: ...rom the furnace to the out side termination B Ventilated combustion air systems from the furnace to the attic or crawl space termination 6 Disassemble the combustion air and vent piping apply cement p...

Page 13: ...0 kW 36 inches 91 cm for models 100 000 BTUH 30 kW Two pipe direct vent applications 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW Single pipe applications 4...

Page 14: ...ombustion air systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 14 or 15 VENTING MULTIPLE UNITS Multiple units can be installed...

Page 15: ...ll bring air in from the outdoors to the furnace combustion air intake collar on the burner box The second pipe Shown in Figure 19 is the furnace vent pipe The combustion air intake pipe should be loc...

Page 16: ...e louver is in the fully open position This type of installation requires that the supply air to the appli ance s be of a sufficient amount to support all of the appliance s in the area Operation of a...

Page 17: ...sage Follow all notes procedures and required materials in the SEALED COMBUS TION AIR SUPPLY section in these instructions when installing the combustion air pipe from the unit and into a ventilated a...

Page 18: ...p pump must be approved for use with acidic condensate CONDENSATE DRAIN TRAP AND DRAIN FREEZE PROTECTION Special precautions MUST be made if installing furnace in an area which may drop below freezing...

Page 19: ...th x 1 8 0 3 cm diameter tubing 2 pieces of 4 10 cm length x 1 8 0 3 cm diameter tubing 1 5 16 0 8 cm tee 1 5 16 0 8 cm x 1 8 0 3 cm reducing coupling 1 1 8 0 3 cm adapter 1 Dwyer Manometer These item...

Page 20: ...3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 15 times 0 10 m3 of gas measured at the...

Page 21: ...l reference atmo spheric pressure Refer to Figure 26 for connection details IMPORTANT The cap for the pressure regulator must be removed entirely to gain access to the adjustment screw Loosening or ti...

Page 22: ...ning the jumper on two of the four pins as shown in Figure 27 The blower speed connections shown in Figure 27 are typical How ever these connections may vary from model to model and may be changed as...

Page 23: ...35 1175 33 1105 31 1045 30 990 28 905 25 890 25 790 22 80 1600 C 100 1600 C HIGH 1960 56 1955 55 1925 55 1890 54 1830 52 1765 50 1695 48 1615 46 1600 45 1485 42 M HI 1565 44 1560 44 1560 44 1575 45 15...

Page 24: ...that total system static is 0 58 w c To determine the system airflow complete the follow ing steps Obtain the airflow values at 0 50 w c 125 Pa 0 60 w c 150 Pa ESP Airflow 0 50 2285 CFM 64 70 m3 min A...

Page 25: ...105561 UIM B 0605 Unitary Products Group 25 SECTION XI WIRING DIAGRAM FIGURE 27 Wiring Diagram...

Page 26: ...105561 UIM B 0605 26 Unitary Products Group NOTES...

Page 27: ...105561 UIM B 0605 Unitary Products Group 27 NOTES...

Page 28: ...o change without notice Printed in U S A 105561 UIM B 0605 Copyright by York International Corp 2005 All rights reserved Supersedes 105561 UIM A 0205 Unitary 5005 Norman Product York OK Group Drive 73...

Reviews: