PRE-INSTALLATION INSPECTION
OF EQUIPMENT

All units are factory tested to ensure safe operation and
quality assembly. Units are packaged and sealed on
shipping skids and shipped in first class condition. Torn
and broken packaging, scratched or dented panels
should be reported to carrier immediately. Internal
inspection of all units should be performed prior to
installation. Remove all access doors and check for
visual defects that can occur during transport. Any
problems found internally should be reported to carrier
and manufacturer immediately. Refrigerant circuit
should be checked to ensure no leaks have occurred
during shipment. Install a gauge set to the high and low
pressure ports to confirm pressure has been main-
tained and no leaks have occurred during shipment.
Repair any damage prior to installation to ensure safe
operation.

NOTE:

Record any unit damage on the Bill of Lading and
report to carrier and factory immediately. Shipping
and handling damages are not warranty items.

RIGGING

To ensure safe installation of the unit when ceiling
mount application is specified, estimate the approxi-
mate center of gravity of the unit. The configuration of
internal components for each unit is different and
weight is unevenly distributed.

INSTALLATION

Location - To ensure unit operates at maximum effi-
ciencies, choose a dry indoor area where the tempera-
ture is controlled between 50

°

F and 115

°

F.

Consideration of surrounding areas should be taken
when choosing a location to install the unit. Common
vibration and sound levels associated with commercial
equipment may be objectionable to people or equip-
ment.

 

Refer to typical installation diagram (Figure 1).

Install thermostats, air supplies and returns so that
each unit will operate only on individual unit control. To
assure fast drainage of condensate run-off, unit can be
slightly pitched in the same direction as drain pan out-
let.

UNIT MOUNTING

The 3 through 15 ton models are shipped as a fully
assembled integral package. These units may be field
split to allow for passage through doors, elevators, hall-
ways, etc. The 20 and 25 ton models are shipped in
two pieces - a separate condensing unit and evapora-
tor module - which are intended for assembly into a
freestanding vertical package on site.

Flanges for all duct connections are shipped in the con-
densing section of the unit for field installation. Duct
flanges for evaporator return are incorporated into the
filter rack.

Prior to mounting unit, check individual unit
weights (pages 7-11) and verify lifting capacity of
lifting equipment exceeds weight of units by safe
margins. Failure to do so may result in unit dam-
age, personal injury or even death

Determine the actual center of gravity of the unit
by performing a test lift. Lifting an unbalanced unit
can cause personal injury or even death.

Lock all electrical power supply switches in the off
position before installing the unit. Failure to discon-
nect power supply may result in electrical shock or
even death.

Failure to allow adequate space between units may
result in poor unit performance and possible unit
failure.

Summary of Contents for EMBASSY Series

Page 1: ...ADJUSTMENT 17 LOW AMBIENT DAMPER INSTALLATION 18 START UP AND OPERATION 19 MAINTENANCE SERVICE 20 See the following page for a complete Table of Contents NOTES CAUTIONS AND WARNINGS The installer shou...

Page 2: ...T CIRCUIT S 20 LIST OF FIGURES Fig Pg 1 DSK TYPICAL APPLICATIONS 4 2 3 4 5 TON UNITS DIMENSIONAL DATA CORNER WEIGHTS 7 3 8 10 TON UNITS DIMENSIONAL DATA CORNER WEIGHTS 8 4 12 15 TON UNITS DIMENSIONAL...

Page 3: ...duce vibration and noise while operating Each refrigerant circuit is equipped with high pressure and low pressure switches An electrically re settable lockout relay will shut off the compressor in the...

Page 4: ...036 21540 001 A 0503 4 Unitary Products Group FIGURE 1 DSK TYPICAL APPLICATIONS...

Page 5: ...urrounding areas should be taken when choosing a location to install the unit Common vibration and sound levels associated with commercial equipment may be objectionable to people or equip ment Refer...

Page 6: ...brackets from the out side corners of the cabinet at the joint line between the evaporator and condenser sections Remove the evaporator section ASSEMBLY OF SPLIT UNITS All models Place the condensing...

Page 7: ...036 21540 001 A 0503 Unitary Products Group 7 FIGURE 2 3 4 5 TON UNITS DIMENSIONAL DATA CORNER WEIGHTS...

Page 8: ...036 21540 001 A 0503 8 Unitary Products Group FIGURE 3 8 10 TON UNITS DIMENSIONAL DATA CORNER WEIGHTS...

Page 9: ...036 21540 001 A 0503 Unitary Products Group 9 FIGURE 4 12 15 TON UNITS DIMENSIONAL DATA CORNER WEIGHTS...

Page 10: ...036 21540 001 A 0503 10 Unitary Products Group FIGURE 5 20 TON UNIT DIMENSIONAL DATA CORNER WEIGHTS...

Page 11: ...036 21540 001 A 0503 Unitary Products Group 11 FIGURE 6 25 TON UNIT DIMENSIONAL DATA CORNER WEIGHTS...

Page 12: ...ute Size condenser air discharge for 1 200 1 500 feet minute nominal velocity Maximum recommended 1 700 feet minute The use of louvers with higher velocities than above may be employed at the discreti...

Page 13: ...ting panel Do not remove fasteners securing blowers to panel The blowers are to remain attached to the mounting panel at all times Carefully remove the blower panel assembly from the evaporator cabine...

Page 14: ...ned to be read Provide individual power disconnects for each unit or each section in the case of split applications Install a secure ground to both evaporator and condenser If canvas flexible joints a...

Page 15: ...230 1 60 1 17 9 88 0 0 50 4 4 1 00 7 4 34 18 50 208 230 3 60 1 11 4 77 0 0 50 2 1 1 00 3 1 19 45 30 460 3 60 1 5 7 39 0 0 50 1 0 1 00 1 4 9 53 15 575 3 60 1 4 7 31 0 0 50 0 8 1 00 1 1 7 79 15 4 TON 20...

Page 16: ...6 870 2 41 920 2 70 970 2 90 1010 3 20 1050 3 46 1100 3 70 1145 3 90 1180 4 30 15 TON 6000 824 2 52 873 2 77 920 3 03 967 3 30 1010 3 58 1052 3 90 1097 4 24 1137 4 59 1178 4 95 1220 5 33 6600 903 3 33...

Page 17: ...1VP44 X 7 8 6 7 AK69H 4L370 1 15 TON 848 1064 5 184 87 5 4 7 5 9 1VP60 X 1 1 8 9 7 BK100H B40 1 20 TON 848 1064 5 184 87 5 4 7 5 9 1VP60 X 1 1 8 9 7 BK100H B50 1 25 TON 902 1082 7 1 2 213 88 5 5 0 6 0...

Page 18: ...ighten the flare nuts securely NOTE On dual and triple compressor units the actuator MUST be connected to the 1 circuit liquid line fit ting Connection to the second or third stage refrig erant circui...

Page 19: ...re is no negative impacts on durability caused by operating three phase Scroll compressors in the reversed direction for a short period of time less than one hour However after several minutes of oper...

Page 20: ...ing screw is properly set Check that the blower wheel is tight on the shaft and that the hub setscrews are properly torqued DRIVE BELTS Examine belts periodically for wear Glazed areas on the drive su...

Reviews: