INSPECTION

As soon as a unit is received, it should be inspected for possible dam-
age during transit. If damage is evident, the extent of the damage
should be noted on the carrier’s freight bill. A separate request for
inspection by the carrier’s agent should be made in writing. Also, before
installation, the unit should be checked for screws or bolts which may
have loosened in transit. There are no shipping or spacer brackets
which need to be removed from the interior of this unit.

FURNACE LOCATION AND CLEARANCES

The furnace shall be located using the following guidelines:

1.

Where a minimum amount of air intake/vent piping and elbows will
be required.

2.

As centralized with the air distribution as possible.

3.

Where adequate combustion air will be available (particularly
when the appliance is not using outdoor combustion air).

4.

Where it will not interfere with proper air circulation in the confined
space.

5.

Where the outdoor vent terminal will not be blocked or restricted.
Refer to “VENT CLEARANCES” located in SECTION VII of these
instructions. These minimum clearances must be maintained in
the installation.

6.

Where the unit will be installed in a level position with no more than
1/4” (6.4 mm) slope side-to-side and front-to-back to provide
proper condensate drainage.

Installation in freezing temperatures:

1.

Furnace shall be installed in an area where ventilation facilities
provide for safe limits of ambient temperature under normal oper-
ating conditions. Ambient temperatures must not fall below 32°F
(0°C) unless the condensate system is protected from freezing. 

2.

Do not allow return air temperature to be below 55ºF (13°C) for
extended periods. To do so may cause condensation to occur in
the main heat exchanger, leading to premature heat exchanger
failure.

3.

If this furnace is installed in an unconditioned space and an
extended power failure occurs, there will be potential damage to
the internal components. Following a power failure situation, do
not operate the unit until inspection and repairs are performed.

Clearances for access/service:

Ample clearances should be provided to permit easy access to the unit.
The following minimum clearances are recommended:

1.

Twenty-four (24) inches (61 cm) between the front of the furnace
and an adjacent wall or another appliance, when access is
required for servicing and cleaning.

2.

Eighteen (18) inches (46 cm) at the side where access is required
for passage to the front when servicing or for inspection or replace-
ment of flue/vent connections.

In all cases, accessibility clearances shall take precedence over clear-
ances for combustible materials where accessibility clearances are
greater.

Installation in a residential garage:

A gas-fired furnace for installation in a residential garage must be
installed so the burner(s) and the ignition source are located not less
than 18” (46 cm) above the floor, and the furnace must be located or
protected to avoid physical damage by vehicles.

All furnaces approved for alcove and attic installation.

FOR FURNACES INSTALLED IN THE COMMON-

WEALTH OF MASSACHUSETTS ONLY

For all side wall horizontally vented gas fueled equipment installed in
every dwelling, building or structure used in whole or in part for resi-
dential purposes, including those owned or operated by the Com-
monwealth and where the side wall exhaust vent termination is less
than seven (7) feet above finished grade in the area of the venting,
including but not limited to decks and porches, the following require-
ments shall be satisfied:

1.

INSTALLATION OF CARBON MONOXIDE DETECTORS. 

At

the time of installation of the side wall horizontal vented gas
fueled equipment, the installing plumber or gasfitter shall
observe that a hard wired carbon monoxide detector with an
alarm and battery back-up is installed on the floor level where
the gas equipment is to be installed. In addition, the installing
plumber or gasfitter shall observe that a battery operated or
hard wired carbon monoxide detector with an alarm is installed
on each additional level of the dwelling, building or structure
served by the side wall horizontal vented gas fueled equipment.
It shall be the responsibility of the property owner to secure the
services of qualified licensed professionals for the installation of
hard wired carbon monoxide detectors

a.

In the event that the side wall horizontally vented gas
fueled equipment is installed in a crawl space or an attic,
the hard wired carbon monoxide detector with alarm and
battery back-up may be installed on the next adjacent floor
level.

b.

In the event that the requirements of this subdivision can
not be met at the time of completion of installation, the
owner shall have a period of thirty (30) days to comply with
the above requirements; provided, however, that during
said thirty (30) day period, a battery operated carbon mon-
oxide detector with an alarm shall be installed.

2.

APPROVED CARBON MONOXIDE DETECTORS. 

Each car-

bon monoxide detector as required in accordance with the
above provisions shall comply with NFPA 720 and be ANSI/UL
2034 listed and IAS certified.

3.

SIGNAGE. 

A metal or plastic identification plate shall be perma-

nently mounted to the exterior of the building at a minimum
height of eight (8) feet above grade directly in line with the
exhaust vent terminal for the horizontally vented gas fueled
heating appliance or equipment. The sign shall read, in print
size no less than one-half (1/2) inch in size, "

GAS VENT

DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUC-
TIONS

".

4.

INSPECTION. 

The state or local gas inspector of the side wall

horizontally vented gas fueled equipment shall not approve the
installation unless, upon inspection, the inspector observes car-
bon monoxide detectors and signage installed in accordance
with the provisions of 248 CMR 5.08(2)(a)1 through 4.

Improper installation in an ambient below 32ºF (0°C) could create a
hazard, resulting in damage, injury or death.

Liquid anti-freeze will cause damage to internal plastic parts of this
furnace. DO NOT attempt to winterize the furnace using liquid
anti-freeze.

Table 1: 

Unit Clearances to Combustibles

Application

Upflow

Downflow

Horizontal

Top

1" 0" 0" 

Vent

0" 0" 0" 

Rear

0" 0" 0" 

Side

0" 0" 1" 

Front

1

1. Line contact only permitted between lines formed by the intersection of the 

rear panel and side panel (top in horizontal position) of the furnace jacket 
and building joists, studs or framing.

0" 0" 0" 

Floor

Combustible

Combustible

2

2. For combustible floors only when used with special sub-base.

Combustible

Closet

Yes

Yes

Yes

Line Contact

No

No

Yes

Summary of Contents for CP9C Series

Page 1: ...rmostat Chart Two Stage Air Conditioner with Single Stage Thermostat Variable Speed Modulating Furnace 17 Thermostat Chart Single Stage Heat Pump Variable Speed Modulating Furnace 18 Thermostat Chart...

Page 2: ...marking Means for providing outdoor air required for combustion Return air temperature maintained between 55 F 13 C and 80 F 27 C The air filter must be replaced upon substantial completion of the co...

Page 3: ...g jurisdiction In the United States and Canada follow all codes and standards for the following using the latest edition available STEP 1 Safety US National Fuel Gas Code NFGC NFPA 54 ANSI Z223 1 and...

Page 4: ...nstalled in every dwelling building or structure used in whole or in part for resi dential purposes including those owned or operated by the Com monwealth and where the side wall exhaust vent terminat...

Page 5: ...ed down for shipment In order to use the flanges remove the screw holding an individual flange rotate the flange so it is in the upward position and reinstall the screw then repeat this for all 4 flan...

Page 6: ...t exchang ers where attached to the vestibule panel Do not use the top return bend of the heat exchangers as lifting points as the tubes may shift out of position or their location brackets baffles SU...

Page 7: ...il casing over or under the furnace opening as shown in Figure 7 after configuring coil flanges as required see Coil Flange sec tion below COIL FLANGE INSTALLATION The coil cabinet includes four remov...

Page 8: ...t such that a minimum dis tance is maintained between the top of the coil and the top of the duct Refer to Table 2 COIL FURNACE ASSEMBLY HD SERIES COILS Horizontal duct coils are referred to as HD ser...

Page 9: ...trical Entry Condensate Drain Optional Return Air Cutout Either side 29 5 For Cladded door add appoximately an additional 75 C SUPPLY END 56 56 20 B 3 23 8 56 Combustion Air Inlet RETURN END B 24 25 2...

Page 10: ...from either side of the furnace using any of the gas pipe entry knockouts on both sides of the furnace Refer to Figures 13 and 16 All filters and mounting provision must be field supplied All installa...

Page 11: ...es to larger 43 orifices which will bring the input rate back up to approxi mately 76 000 BTU H which is what it should be for that furnace at 6 000 feet SECTION V ELECTRICAL POWER ELECTRICAL POWER CO...

Page 12: ...bushing where the wires pass through the furnace panel After making the wiring connections replace the wiring box cover and screws Refer to Figure 17 3 The furnace s control system requires correct p...

Page 13: ...or heat pump with a fully communicating control This furnace may also be used along with the Communicating Thermo stat Control and a non communicating outdoor air conditioner through the addition of...

Page 14: ...tage wiring as shown in Figure 24 This furnace control board can control a two stage A C using only a sin gle stage thermostat In this case the furnace control switches between high cool and low cool...

Page 15: ...Heat Clipping Jumper W914 for electric heat on thermostat is not necessary C 24 Volt Common Y Compressor SINGLE STAGE AIR CONDITIONER Y Compressor Contactor SINGLE STAGE AIR CONDITIONER C 24 Volt Com...

Page 16: ...Volt Hot Y1 Single Stage Compressor MODULATING FURNACE CONTROL G Fan MODULATING FURNACE Y Y2 Second or Full Stage Compressor DHUM Dehumidification Open on Humidity Rise W Modulating Heat Move HUMIDIST...

Page 17: ...ssary C 24 Volt Common R 24 Volt Hot Y1 Single Stage Compressor MODULATING FURNACE CONTROL G Fan MODULATING FURNACE Y Y2 Second or Full Stage Compressor DHUM Dehumidification Open on Humidity Rise W M...

Page 18: ...CONTROL X L Malfunction Light W Auxiliary Heat SINGLE STAGE HEAT PUMP Y2 Second Stage Compressor Step 9 of Thermostat Installer Configuration Menu must be set to Pump OFF Step 1 of Thermostat Installe...

Page 19: ...Energized in Cool C 24 Volt Common R 24 Volt Hot W1 OUT First Stage Heat W2 OUT Second Stage Heat Y2 OUT Second Stage Compressor Y1 Single Stage Compressor X L Malfunction Light Y2 Second Stage Compre...

Page 20: ...at XFMR RC 24 Volt Hot Cool XFMR AUX Auxiliary Heat Step 1 of Thermostat Installer Configuration Menu must be set to HP2 Selection of GAS ELEC switch on thermostat not necessary Thermostat Installer S...

Page 21: ...the W signal is removed 2 Defrost Cycle When both a W signal and a Y2 signal are pres ent the modulating firing rate will operate at a constant 80 firing rate and there will be no Run 2 function so th...

Page 22: ...and drain hose located in the loose parts bag The intake drain hose is to be installed by connecting it to the inlet pipe coupling and to the collec tor box as shown in Figures 29 31 and 32 The drain...

Page 23: ...ff so that no sagging loops will collect and hold condensate which will cause the furnace to not operate Shorten pressure switch hose Re route and shorten pressure switch hose Shorten rain gutter hose...

Page 24: ...tch hose to this position NOTE May require the longer hose that is provided with wider cabinets Move condensate drain hose to this position May exit either side of the cabinet Move rain gutter hose to...

Page 25: ...ose to this position NOTE May require the longer hose that is provided with wider cabinets Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this position Mov...

Page 26: ...tting provided Move condensate drain hose to this position Move rain gutter hose to this position Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this posit...

Page 27: ...to American National Standards Institute ANSI and American Society for Test ing and Materials ASTM standards D1785 Schedule 40 PVC D2665 PVC DWV F891 PVC DWV Cellular Core D2261 ABS DWV or F628 Schedu...

Page 28: ...5 80 000 4 125 100 000 2 20 100 000 2 NA 100 000 3 80 100 000 3 60 100 000 4 145 100 000 4 125 120 000 3 80 120 000 3 60 120 000 4 145 120 000 4 125 Elevation 4001 5000 Elevation 8001 9000 Model Input...

Page 29: ...VENTING FIGURE 33 Dimensions TABLE 8 Elbow Dimensions Elbow A Dimension Illustrated in Figure 33 2 Standard 2 5 16 3 Standard 3 1 16 2 Sweep 3 1 4 3 Sweep 4 1 16 TABLE 9 Equivalent Length of Fittings...

Page 30: ...equirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier F Clearance to outside corner 12 30 5 cm or in accordance with local...

Page 31: ...Each furnace must have a separate vent pipe Under NO circumstances can the two vent pipes be tied together The combustion air side of the two pipe configuration shown in Figures 36 and 37 can be insta...

Page 32: ...ipes are not termi nated in the same atmospheric zone Refer to Figure 44 for attic and crawl space termination Only the combustion air intake may terminate in the attic The vent must terminate outside...

Page 33: ...as an exhaust fan kitchen ventilation system clothes dryer or fireplace may cre ate conditions requiring special attention to avoid unsatisfactory operation of gas appliances A venting problem or a l...

Page 34: ...Refer to Table 7 for intake pipe sizing allowable length and elbow usage Follow all notes procedures and required materials in the COMBUSTION AIR VENT PIPE SIZING section in these instructions when i...

Page 35: ...no thermostat calls no call for heating cooling or continuous fan push and hold the TEST but ton on the board for one second The LED on the board will glow red 2 Release the TEST button The LED on the...

Page 36: ...ifice hole is essential for proper flame characteristics DO NOT bottom out gas valve regulator adjusting screw This can result in unregulated manifold pressure and result in excess over fire and heat...

Page 37: ...R jumper on the furnace control board The jumper is factory set to deliver an air temperature rise near the midpoint of the nameplate temperature rise range If more air is desired lower temper ature r...

Page 38: ...e southern part of the country On a call for cooling the blower will ramp up to 50 of full capacity and will stay there for two minutes then will ramp up to 82 of full capacity and will stay there for...

Page 39: ...90 840 H B 1100 715 1090 710 MH B 1065 690 1015 660 H A 1000 650 1000 650 MH A 960 625 960 625 H C 760 495 760 495 ML B 900 585 900 585 MH C 660 430 660 430 L B 690 450 680 445 ML A 600 400 600 400 L...

Page 40: ...e is equipped with a high temperature limit control mounted to the left side of the furnace vestibule panel This limit switch will open and shut off gas to the burners if it detects excessive air temp...

Page 41: ...ating airflow an open fuse on the control board Five Red Flashes Rollout switch or condensate pressure switch open Check the rollout switch es on the burner assembly It is a man ual reset switch To re...

Page 42: ...GHT GLASS OVAL 2 Req d GASKET FOAM Door 1 5 ft req d PAN CONDENSATE BRACKET DOOR HARNESS WIRING FERRULE 3 Req d GROMMET 3 Req d MOTOR MOUNT TUBING SILICON HOSE RAIN GUTTER HOSE CONDENSATE PLUG SEAL 7...

Page 43: ...und neutral Gas valve shorted ON Check blower motor wiring ID plug missing OR not connected properly None Slow Green Rapid Green Slow Amber Rapid Amber 2 Amber 3 Amber 4 Amber 5 Amber 6 Amber Steady R...

Page 44: ...1083292 UIM A 0114 44 Johnson Controls Unitary Products NOTES...

Page 45: ...neutral Ground wire is connected Line voltage value to furnace volts AC Low voltage value between R and C on furnace control board volts AC Thermostat Type Other System Equipment and Accessories Owne...

Page 46: ...Calculated input in btuh clock the gas meter Nat Gas Only Manifold Gas Pressure in w c furnace must be in TEST mode for setup Inlet Gas Pressure in w c LP Gas Conversion Kit Part Used Burner flame in...

Reviews: