6
aSSemBLy InStrUCtIonS
getting starteD
Collapse box bottom and lay sides down before assembly. Do not dispose of the packing materials until assembly is
completed. Read each step carefully before beginning. If you are missing a part, please contact our technical support.
After unpacking the unit, open the hardware bag and make sure that you have all the following items. Some hardware may
be already attached to the part.
harDware iDentification chart
This chart is provided to help identify the hardware used in the assembly process. Place the washers, the end of the bolts,
or screws on the circles to check for the correct diameter. Use the small scale to check the length of the bolts and screws.
note: the length of All bolts And screws eXcept those with flAt heAds is meAsured from below the heAd to the end of the
bolt or screw. flAt heAd bolts And screws Are meAsured from the top of the heAd to the end of the bolt or screw.
Part B x 8
SCREW (M8 X 20L)
Part C x 6
SCREW (M4 X 6L)
Part D x 4
CURVED WASHER (Ø8 X Ø19)
Part E x 4
WASHER (Ø8 X Ø18)
tools
risk warning
do not moVe treAdmill out of the boX until unit is Assembled And do not tip the boX on its side with the treAdmill in
it. Also once the Assembled treAdmill hAs been remoVed from the boX do not tip the treAdmill on its side. collApse
boX bottom And lAy sides down before Assembly. when moVing Assembled treAdmill out of the boX, moVe it out of the
boX on its wheels while the decK is in the folded And locKed position. fAilure to follow this procedure mAy result in
serious inJury due to pinch point AreA on the front frAme neAr the motor coVer.
Summary of Contents for 51090-G03 Abmition
Page 23: ...23 EXPLODED DRAWING ...
Page 24: ... 2009 YORK BARBELL ...