Toc-3
IM 12J05D02-01E
9th Edition: Aug. 05, 2015-00
Procedure for Water calibration .........................................................6-5
Calibration method using manual calibration method .................................6-6
Procedure for manual calibration .......................................................6-7
Overall dissolved oxygen metering system ..................................................7-1
Inspection and maintenance to be implemented periodically ........... 7-1
Inspection and maintenance to be implemented on occasion .......... 7-1
Periodic maintenance for the EXA DO402G converter .................................7-2
Measures in the case of converter operation failure ....................................8-1
No dissolved-oxygen converter operation .........................................8-1
Operation key or display failure .........................................................8-1
Measures in the case of failure (Error) detection ..........................................8-1
10.1 Setpoint ............................................................................................................10-1
10.2 Range ...............................................................................................................10-1
10.3 Hold ..................................................................................................................10-1
10.4 Wash .................................................................................................................10-2
10.5
Customer Maintenance Parts List (for Style: S3) ............. CMPL 12J05D02-03E
Revision Information ...............................................................................................i
Summary of Contents for EXA DO402G
Page 9: ...Blank Page...
Page 23: ...Blank Page...
Page 77: ...Blank Page...
Page 81: ...Blank Page...
Page 85: ...Blank Page...
Page 87: ...Blank Page...
Page 95: ...Blank Page...