Chapter 6
Maintenance, Inspection and Storage
6.2
Operational Inspection
6-3
6
6.2
Operational Inspection
6.2.1 Inspection
when
the unit is turned on
The unit performs the initialization processing from the time when it is turned on until the time
when it becomes operable. It takes about a few seconds for the process to be completed.
For starting up the unit, refer to Chapter 3.
(
☛
Section 3.1 Turning the Power ON/OFF)
After a few second when the unit is turned on, check that LED in switches are lighting.
6.2.2 Operational inspection of each switch
●
Check the operations of each switch.
Operate each switch once briefly to check that the unit functions properly.
6.2.3 Inspection of output level
●
Measurement procedures
Check the output level following xyz-axes adjustment procedures.
z
If any abnormal situation occurs in the hardware during initialization processing, LED in
switches are not lighting.
z
If the fan does not work, lamp continue on and off. In this case, turn [POWER] off.
If these situations occur, the unit must be repaired. Contact our Service Dept., Sales Dept.,
or nearest office immediately.
(
☛
Contact information is described at the end of the document.)
Caution
z
If abnormal situation occurs, the unit must be repaired. Contact our Service Dept., Sales
Dept., or nearest office immediately.
(
☛
Contact information is described at the end of the document.)
Caution
Summary of Contents for AQ4305
Page 1: ......
Page 2: ......
Page 4: ...ii ...
Page 14: ...CONTENTS xii ...
Page 20: ...1 4 Warranty Chapter 1 Introduction 1 6 ...
Page 30: ...3 2 Interface Connection Procedures Chapter 3 Before You Start 3 4 ...
Page 40: ...5 2 GP IB interface Chapter 5 Operating Procedures 5 4 ...
Page 50: ...77 2 External Dimensions Chapter 7 Specifications 7 4 ...