YMGI
•
Your Modern Green Idea
23
Preparation of the wall
The sleeve should be installed during construction and lintels should be used to support the block above the wall
sleeve. The sleeve cannot support the load of bricks/blocks.
For existing construction, wall opening must be created, the proper dimensions are necessary to avoid use of fillers
or additional framing .The sleeve is modular in height and width (refer to Fig 5& Chart 2).
Height:
Fits 2 courses concrete block
Fits 6 courses standard brick
Fits 5 courses jumbo brick
Width:
Fit approximately 3 stud spaces.
Wall sleeve location
When making the wall opening, please observe the following requirement:
1.
The air inlet and outlet should be unblocked and the air can be delivered to every corner of the room
2.
Install the unit in places that are away from heat source or sources of flammable gases.
3.
Do not install the unit in places that are subject to strong dust
4.
Do not install the unit in places where the operational noise and exhausted air might trouble your
neighbor.
5.
There should be sufficient space margins around the unit to facilitate maintenance and repairs (refer to
Figs 3 and 4)
Minimum Finished Opening Dimensions
Sleeve Dimensions
Height
Width
Height
Width
Depth
NO.1
16-1/4"
42-1/2"
16"
42"
13-3/4"
(16"/18"/24")
NO.2
16-1/4"
42-1/4"
NOTE:
NO.1 means using field supplied sleeve angles
NO.2 means not using field supplied sleeve angles
In order for condensate water to drain properly inside the unit, the sleeve must be installed properly:
•
Level from right to left.
•
A slight downward pitch from the indoor side to the outdoor side as shown below (Fig 6).
•
Fasten the wall sleeve (Fig 7).