
YMGI, Engineered Comfort Products for A Sustainable and Efficient Green World!
YMGI: Your Modern Green Idea
36
3
Lightly press the pliers together
so that the crimping tabs lie
securely within the crimping die.
4
Insert the stripped cable until
the insulation comes into
contact with the crimping insert.
Close the crimping tool
completely. When finished,
check the crimp and make sure
the wires are firmly secured.
5
Push the crimped contact into
the socket of the plug insulator
until it engages. Pull lightly on
the lead to check that the metal
part has engaged.
6
Insert the test pin with the
corresponding side into the
socket, or plug to the end
position. If the contact is
correctly assembled, the white
marking on the test pin will be
visible.
7
Screw on the cable nut, hand-
tighten.
The torque must be adapted to
the solar cables used
individually. Typical values are
between 2.5Nm to 3Nm
8
Push the couplers together until
they lock. Check for correct
engagement by tugging on the
coupling
.