background image

 

MAINTENANCE 

Lubrication Symbols 

 

Lubricate with grease at hourly interval indicated on symbol. 

Lubrication Intervals

 

 

 

 

 

 

 

 

 

 

IMPORTANT: The recommended service intervals are based on normal conditions; 

severe or unusual conditions may require more frequent lubrication.  

Perform each lubrication and service procedure at the beginning and end of each season. 
Clean grease fittings before using grease gun, to avoid injecting dirt and grit into the 
bearing. Replace any lost or broken fittings immediately. If a fitting fails to take grease, 
remove and clean thoroughly, replace fitting if necessary. Also check for failure of 
adjoining parts. 

 

 
 

Storing the Equipment 

Store the machine in an area away from human activity 
Store machine in RAISED position.

  

Install service locks on all wheel cylinders.  
At the end of the season, the machine should be thoroughly inspected and prepared for 
storage. Repair or replace any worn or damaged components to prevent down time at the 
start of the next season. Store machine under cover with all parts in operating condition.  

  Clean machine thoroughly to remove all dirt, debris and crop residue, which would 

hold moisture and cause rusting. 

  Inspect machine for worn or broken parts. See your Yetter Farm Equipment dealer 

during the off-season so that parts or service can be acquired when machine is not 
needed in the field. 

  Lubricate bearings as outlined in the Lubrication section  

  Paint all parts which are chipped or worn and require repainting. 

  Store machine in a clean, dry place with the planting unit out of the sun. 

  If the machine cannot be stored inside, cover with a waterproof tarpaulin and tie 

securely in place. 

  Do not allow children to play on or around the machine  

 

Summary of Contents for 2966-020A

Page 1: ...IN ROW PLANTER OPERATOR S MANUAL PART IDENTIFICATION 2565 780_REV_E 08 2023 YETTER MANUFACTURING CO FOUNDED 1930 Colchester IL 62326 0358 Toll free 800 447 5777 309 776 3222 Fax Website www yetterco c...

Page 2: ...oduct according to the maintenance schedule in the operator s manual The user is responsible for inspecting his machine and for having parts repaired or replaced when continued use of the product woul...

Page 3: ...e implement before performing service If the machine must be serviced in the raised position jack or block it up to prevent it from accidentally falling and injuring someone Do not allow riders on the...

Page 4: ...er tightening Tightening hardware beyond the recommended range can reduce its shock load capacity The chart below is a guide for proper torque Use it unless a specified torque is called out elsewhere...

Page 5: ...5 ASSEMBLY INSTRUCTIONS Step 1 Attach the Residue Manager Wheel Assembly to Arm Assembly torque 180 ft lbs...

Page 6: ...6 ASSEMBLY INSTRUCTIONS Step 2 Attach the Residue Manager to the planter row unit using 3 12 mm x 45 mm bolts torque 97 ft lbs...

Page 7: ...iveness of the incorporated herbicide ROW CLEANER DO S AND DON TS 1 DO NOT move soil Residue Managers are designed to move crop residue only 2 DO NOT operate planter at slow speeds ground speed affect...

Page 8: ...e interval Use a multi purpose polyurea water resistant moderate speed and NLGI grade 2 grease Other greases may be used if they meet the following NLGI Performance Classification GC LB IMPORTANT Some...

Page 9: ...service locks on all wheel cylinders At the end of the season the machine should be thoroughly inspected and prepared for storage Repair or replace any worn or damaged components to prevent down time...

Page 10: ...10 PARTS IDENTIFICATION 2966 020A L ST FW 2966 020A R ST FW...

Page 11: ...11 PARTS IDENTIFICATION 2966 100 LEFT HAND ASSEMBLY...

Page 12: ...12 PARTS IDENTIFICATION 2966 101 RIGHT HAND ASSEMBLY...

Page 13: ...13 PARTS IDENTIFICATION 2966 117 ST FW SHOWN 2966 116 ST FW...

Page 14: ...14 PARTS IDENTIFICATION 2966 116 STF FW SHOWN RIGHT HAND 2966 117 STF FW LEFT HAND...

Page 15: ...INDLE 1 7 2965 502 HUB ASSEMBLY 1 157 SPINDLE 1 ITEM PART NO DESCRIPTION QTY 1 2505 207 5 16 18 X 1 1 4 CARRIAGE HEAD BOLT GRADE 5 4 2 2520 206 5 16 18 FLANGE LOCK NUT 4 3 2570 766 D BOLT FLANGE HEAD...

Page 16: ...16 2565 780_REV_E 08 2023...

Reviews: