background image

1

575 has full cable housing. Putting  full cable housing helps prevent corrosion from the elements and thus 
keeps the shifting smoother for a longer period of time.

Line Setup

setuP 

hOUSING

hOusinG enD CaPs 

Yeti recommends using metal end 

caps. The metal caps do not allow the cable to pull through 
as do the plastic versions. Do not mix up the shift and brake 
housing because it will result in a loss in performance.

Caution: 

The failure to properly routing shifter housing can cause malfunction of the shift mechanism and 

unexpected shifting of gears. 

rear Derailleur

 Fit a piece of housing from the rear shifter across 

the head tube into the first cable stop on non-drive side of the top 

tube. 

Take another piece of housing and secure it in the second stop on the non-
drive side of the top tube. Run the housing over the shock in to the stop on 
the seatstay. Make sure there is enough housing so it does not bind on the 
shock body.

The last piece of housing in run from the second stop on the seatstay into 
the derailleur.  

frOnt Derailleur

 Fit a piece of housing from the front shifter 

across the head tube into the first cable stop on drive side of the top 

tube. 

Take another piece of housing and secure it in the second stop on the drive 
side of the top tube. Run the housing across the shock , through the space 
between the top of the dogbone and the under side of the top tube. Secure 
the end of this housing in the stop placed on the seatube.  Create an arcing 
loop so the cable can run smoothly.

rear brake

 Run the brake line across the head tube to the first 

open cable stop on the non-drive side of the top tube

Run the line down along the shock body and into the first open cable stop 
on the seatstay. Continue down into the second stop on the seatstay and 
attach the line to the caliper.

1

2

3

Summary of Contents for AS-Rsl

Page 1: ...Yeti Cycles 600 Corporate Circle Unit D Golden CO USA p 303 278 6909 888 576 9384 www yeticycles com...

Page 2: ...ures 6 Geometry 8 Maintenance Schedule 10 Bike Setup Overview 12 Shock Setup FOX RP3 14 Quick Start Guide 15 Cable Routing 16 Assembly Overview 18 Assembly 20 Disassembly Tips 24 Exploded Views 26 Par...

Page 3: ...inor injuries or damage to your bicycle or a component of your bicycle Be sure to read and understand all of the Warnings and Cautions Congratulations on your purchase of a new Yeti bicycle We are con...

Page 4: ...bon Flex pivot allowed us to shave weight and increase performance I beam construction has great lateral stiffness yet smooth suspension performance 5 Shock 6 5 eye to eye 1 5 stroke 6 Dogbone Dogbone...

Page 5: ...ork Xs S M L a 16 75 18 0 19 0 21 3 b 21 0 22 4 23 4 24 4 c 74 73 73 73 d 71 71 71 71 e 16 9 16 9 16 9 16 9 f 40 3 41 6 42 6 43 6 g 12 75 12 75 12 75 12 75 h 27 5 28 0 28 0 28 0 i 4 0 4 0 4 5 5 25 B G...

Page 6: ...check out the repair help section This section contains detailed instruction on many of the service items listed in the maintenance schedule Torque YETI has outlined a brief list of torque specificati...

Page 7: ...The shock should be returned to an Authorized Fox Racing Shox service center for repair To remove the shock from the linkage will require the Yeti linkage tool The linkage tool is necessary to proper...

Page 8: ...the main spring air pressure To reduce sag increase the main spring air pressure Refer to the quick start guide to get your starting air pressure Sag Once you have set your baseline air pressure you n...

Page 9: ...n the housing over the shock in to the stop on the seatstay Make sure there is enough housing so it does not bind on the shock body The last piece of housing in run from the second stop on the seatsta...

Page 10: ...ps Make sure your tools are in good condition A worn allen key round the hex on a bolt not allowing for proper torque Torque settings are listed throughout the instructions It is also import to prep a...

Page 11: ...to hold the shock assembly in place Swing the Dogbone into mounting position two Slide a 22mm female Yeti bolt and washer through the mounting hole Tap the 22mm female Yeti bolt into position with th...

Page 12: ...lt with a washer on the opposing side of the female bolt and thread into position Cinch down both male Yeti bolts with the 5mm allen keys The last step is to install the derailleur hanger and water bo...

Page 13: ...ounting bolt place on 5mm allen key on both end of the bolt and turn counter clockwise One the male Yeti bolt is removed take a 6mm allen key and tap out the female end Note this method works for all...

Page 14: ...5 1 300030085 Main Pivot Pin 6 1 300030087 Steel Pin 1 38 7 2 300020025 Needle Bearing 8 2 300020001 Main Pivot Bearing 9 2 300020027 688 2RS Bearing 10 2 300020026 688 2rs W Ext Ring Bearing 11 2 300...

Page 15: ...PIN 2 300030090 PIN 1 300030094 O RING 2 500050066 AS R 03 05 Rear Tri bearings not included 1 600000021 AS R FrontTri 1 500060016 AS R Dogbone Bearings 03 05 1 300020027 AS R 16MMX8MMX5MM BRG 688 2R...

Page 16: ...5 ID X 687 OD X 3125 2 300020001 BEARING 6903 2 300030076 BOLT PIVOT FEMALE YETI CR MO 35 5 MM 1 300030077 BOLT PIVOT FEMALE YETI CR MO CP 24 8MM 2 300030078 BOLT PIVOT MALE YETI CR MO CP M6X17MM 3 3...

Page 17: ...ented to an authorized Yeti dealer together with proof of purchase The above warranties have been in effect since January 2000 All Yeti frames sold prior to that date had a limited 1 one year warranty...

Reviews: