2.5  Meter startup and operation 

 

 

Make sure that all necessary safety precautions have been taken. Make sure that proper 
ventilation, fire prevention, fire procedures and evacuation paths are provided. 
 

 

 

Open the vapor line.  

 

Check all connections with a soap solution for leaks.  

 

Admit  liquid slowly  into  the system by  opening the  ball  valve  of the supply  line.  As  there 
may still be some air or nitrogen in the system it is important to control the flow to prevent 
damage to the meter. Make sure that the meter does not run faster than 25% of its rated 
flow. Air or nitrogen should be eliminated gradually and carefully.  

 

After  air  or  nitrogen  is  removed  and  the  system  is  full  with  LPG  it  can  run  within  its 
specified parameters.  

 

Perform this sequence at first start up and after internal pressure has been relieved (also 
see 2.6.1). 

 

 

Most systems use an above ground or submersible pump. Make sure that the pump can operate 
against closed valves or with limited flow.   
 

 

2.6  Meter maintenance 

 

 

Make sure that all internal pressure is relieved before disassembly or inspection of any part of the 
hydraulic system. Failing to follow this instruction may lead to severe personal injury or   property 
damage. 
 

 

ALWAYS  disconnect  and  lock  power  supply  before  starting  to  service  the  meter  and  other 
hydraulic parts.  
 

 

2.6.1 

Procedure for relieving internal pressure  

 

 

Unless  permitted  by  (local)  regulations,  relieving  internal  pressure  should  not  be  done  to  the 
atmosphere.  Check  local  regulations,  standards  and  codes  for  the  permitted  procedure  of 
degassing LPG hydraulics.   
 

 

This  procedure  describes  purging  the  hydraulic  system 
with nitrogen: 
 

 

Record the totalizer readings from the 
dispenser in coordination with the station 
manager. 

 

Open the front and rear panel of the dispenser. 
The rear panel should be opened as well to 
ensure proper ventilation. 

 

Remove the plug from the dispenser test port. 

 

Connect the nozzle of the dispenser to the 
maintenance port in the dispenser cabinet.  

 

Summary of Contents for LPG Flow Meter

Page 1: ...LPG Flow Meter Installation and Operation Manual Manual LPG Flow Meter IOM Manual code LFM 02 e Number of pages 19 Issue date August 23 2004 Review number 7 Last review date December 26 2018...

Page 2: ...nes The remarks and warnings inform the operator of the hazards involved in working with Yenen meters Reading these instructions and preventing hazardous situations is strictly in the hands of the ope...

Page 3: ...rs Accuracy class 1 0 Environmental class M2 E1 Maximum permissible error 1 0 1 2 Safety precautions Only trained and qualified personnel familiar with handling liquids under pressure such as LPG may...

Page 4: ...e fluid is being submitted into a cylinder through the distribution valve At the same time the fluid ahead of it is being displaced out of the meter through the outlet Four pistons in the cylinders ar...

Page 5: ...ter The serial number is related to a date code YYMM9999 For example a meter with serial number 01101234 is manufactured in October 2001 with serial number 1234 Record the meter serial number and mode...

Page 6: ...nt range and 0 5 in steps of 0 05 Accuracy curve Flow rate liters per minute Pressure drop curve Flow rate liters per minute 2 2 Installation requirements Make sure that all internal pressure is relie...

Page 7: ...It is of vital importance for functionality and accuracy that dirt dust and other debris does not enter the meter Ensure that the entire piping system is free from dirt dust and debris as this may af...

Page 8: ...Page 8 19 26 12 2011 LFM 02 e Rev Nr 7 2 3 Meter dimensions 118 5 118 5 320 238 118 5 153 INLET OUTLET FOR RELIEF VALVE FRONT VIEW OUTLET BOTTOM BOTTOM VIEW Figure 2 Flowmeter General Dimensions...

Page 9: ...ilter should be replaced regularly Especially in the first month of operation the filter should be checked and replaced at least twice a month 1 Nozzle 2 Break away coupling 3 Differential valve 4 Met...

Page 10: ...ground or submersible pump Make sure that the pump can operate against closed valves or with limited flow 2 6 Meter maintenance Make sure that all internal pressure is relieved before disassembly or i...

Page 11: ...te the pressure The pressure value has to be higher than tank pressure with approximately 2 3 bars Run roughly 10 liters of nitrogen through the system to flush all LPG back to the storage tank Close...

Page 12: ...Check the o rings O rings should be smooth Cracked warn or dry o rings need to be replaced Also scratched o rings may cause inaccuracy of the meter Check the gaskets Gaskets should be firm but flexib...

Page 13: ...er The distribution valve has a precision polished surface Even the slightest scratch or unevenness will cause inaccuracy of the meter Recalibration after re assembly of the meter is recommended Meter...

Page 14: ...rities may break and reseal dispensers Remove the seal Unbolt the adjustment cover on the flow meter Figure 5 Adjustment disc with shaft Calibration is accomplished with a series of holes at the adjus...

Page 15: ...ion and shipping Flow meter should not be removed from its packing during transportation and storage packaging Be careful about the directional arrows on the meter box during the transportation Do not...

Page 16: ...any LPG related work on the forecourt DO be aware of vapors and other hazardous conditions DO disconnect and lock power before starting to service the meter and other hydraulic parts DO know the assoc...

Page 17: ...r maintenance is complete DON T allow smoking flame or spark producing devices near the work area DON T place tools or equipment outside the barricaded work area DON T place tools or equipment outside...

Page 18: ...rge valves Check valve Manometer Safety relief valve Common connections on the hydraulic set 3 17 19 metric wrench 3 4 NPT connections Hydraulic connectors Break Away Access Flow Valve Nozzle Differen...

Page 19: ...Page 19 19 26 12 2011 LFM 02 e Rev Nr 7 Ak emsettin Mahallesi Tavuk uyolu Sokak No 23 Sultanbeyli 34925 Istanbul T rkiye T 90 216 487 5924 F 90 216 487 5986 E info yenen com www yenen com...

Reviews: