RIGGING
The Yazaki chiller-heater is designed
for overhead rigging with openings in the
cabinet and holes in the equipment frame
intended for such use. Ensure that the
crane being used is proper for the mass
to be lifted.
When rigging for overhead lift, remove
the four cardboard or sheet metal covers
on the top panel to expose the lugs for
rigging. Attach shackle bolts to these
lugs. Bring the four individual rigging
cables together at a point high enough
that the angle between the rigging line
and the top of the unit is no less than
60°, as shown in the drawings below.
Once the unit is in final position, locate
the four top panel blanks which are
included in the accessories box. Install
these blanks in order to keep the cabinet
weatherproof.
Cable
(from Top
View)
Minimum Length
ft
(m)
A
11.5
(3.5)
B
11.0
(3.3)
C
9.75
(3.0)
D
8.75
(2.7)
Figure 5
– Rigging
Summary of Contents for AROACE CH-MG150
Page 4: ...4 EQUIPMENT DIMENSIONS Figure 1 MG150 Dimensions ...
Page 5: ...5 EQUIPMENT DIMENSIONS Figure 2 MG200 Dimensions ...
Page 6: ...6 INTERNAL WIRING DIAGRAM ...
Page 7: ...7 ...
Page 8: ...8 Table 2 Internal Wiring Diagram Legend KRCH relay has been replaced by the KCH relay ...
Page 12: ...12 INSTALLATION CLEARANCES Figure 7 Installation and Service Clearances ...