17
EN
O R I G I N A L I N S T R U C T I O N S
MAINTENANCE AND OVERHAUL
ATTENTION! Before any adjustment, technical service or maintenance operations unplug the tool. Once the operations have been
fi
nished, the technical conditions of the tool must be assessed by means of external evaluation and inspection of the following
elements: body and handle, conductor with a plug and de
fl
ection, functioning of the electric switch, patency of ventilation slots,
sparking of brushes, noise level of functioning of bearings and gears, start-up and smoothness of operation. During the guarantee
period, the user cannot dismantle the electric tools or change any sub-assemblies or elements, since it will cancel any guarantee
rights. All irregularities detected at overhaul or during functioning of the tools are a signal to have the tool repaired at a service
shop. Once the functioning has been concluded, the casing, ventilation slots, switches, additional handle and protections must be
cleansed with a stream of air (at a pressure not exceeding 0.3 MPa), with a brush or a cloth without any chemical substances or
cleaning liquids. Tools and handles must be cleansed with a clean cloth.
Summary of Contents for YT-82055
Page 25: ...25 RU residual current device RCD...
Page 26: ...26 RU...
Page 27: ...27 RU II III IV M14 V VI VII VIII IX...
Page 28: ...28 RU X R L 30...
Page 29: ...29 RU L...
Page 30: ...30 RU 0 3 MPa...
Page 32: ...32 UA residual current device RCD...
Page 33: ...33 UA...
Page 34: ...34 UA II III IV 3 M14 V VI VII VIII IX R L...
Page 35: ...35 UA 30 L...
Page 36: ...36 UA 0 3 MPa...
Page 98: ...98 GR RCD RCD...
Page 99: ...99 GR...
Page 100: ...100 GR II III IV 3 M14 V VI VII VIII IX...
Page 101: ...101 GR X R L 30 L...
Page 102: ...102 GR...
Page 103: ...103 GR 0 3 MPa...
Page 105: ...105 BG RCD RCD...
Page 106: ...106 BG 130O C...
Page 107: ...107 BG II III IV 3 M14 V VI...
Page 108: ...108 BG VII VIII IX X R L 30...
Page 109: ...109 BG L...
Page 110: ...110 BG 0 3 MPa...