7.1 Flow of Trial Operation
7.1.1 Flow of Trial Operation for Rotary Servomotors
7-2
7.1
Flow of Trial Operation
7.1.1
Flow of Trial Operation for Rotary Servomotors
The procedure for trial operation is given below.
•
Preparations for Trial Operation
•
Trial Operation
Step
Meaning
Reference
1
Installation
Install the Servomotor and SERVOPACK
according to the installation conditions. First,
operation is checked with no load. Do not
connect the Servomotor to the machine.
2
Wiring and Connections
Wire and connect the SERVOPACK. First,
Servomotor operation is checked without a
load. Do not connect the CN1 connector on
the SERVOPACK.
Chapter 4 Wiring and Connecting
3
Confirmations before Trial Operation
7.2 Inspections and Confirmations before Trial Operation
4
Power ON
−
5
Resetting the Absolute Encoder
This step is necessary only for a Servomotor
with an Absolute Encoder.
5.15 Resetting the Absolute Encoder
Step
Meaning
Reference
1
Trial Operation for the Servomotor without
a Load
7.3 Trial Operation for the Servomotor without a Load
2
Trial Operation with Digital I/O and Serial
Communications
7.4 Trial Operation with Digital I/O and Serial Communica-
tions
Continued on next page.
To power
supply
Secure the motor flange to the
machine. Do not connect the
motor shaft to the load shaft.
To power
supply
To host controller
Secure the motor flange to the
machine. Do not connect the
motor shaft to the load shaft.