+
8.
Insert the cotter pin through the hole in the axle. Bend open
and spread the prongs in opposite directions so the axle nut
will not come off (make sure the tire spins freely).
Installation of the
cotter
pin
is
important and
required. Failure to install the
cotter
pin can result in
loss of wheel
retention.
Always assemble using a new
cotter
pin. Do not
reuse.
9. Use a soft-faced hammer to tap the anti-dust washer in the
right position.
10. Align the wheel cap against the wheel hub. Use a soft-faced
hammer to tap the wheel cap onto the wheel hub properly.
11. Follow the same procedure to assemble the other wheel
(follow steps 3 - 10 under wheel assembly.)
BEAM
1. Hold and pull the beam until the log cradle mount and the
beam is against the wooden block in-pallet.
Beam
Log Cradle Mount
Wooden Block
Figure3a
2. Slowly lift the top of the beam and stand the beam on the end
plate in the vertical position.
13
I Assembly
Figure3b
65916US25M104_GB.indd 13
TOWBAR
After the beam and cylinder assembly
is
in the
vertical position, a helper
is
needed to prevent
the beam
from
tipping over until it
is
secured on
the hydraulic tank assembly with the hitch pin
and R-clip.
The beam assembly
is
heavy and has a small foot
print. When in the vertical position, the beam may
fall, causing damage to the machine and could
result in personal injury.
Insert the tow bar into the tank pivot mount. Align the holes in
the tow bar with the holes in the tank pivot mount. Connect and
tighten the tow bar to the tank by using the M12x90 bolts, flat
washers, spring washer, and nuts. (See Fi:,ure 4)
Tank Pivot Mount
2
M12x90(x2l
Figure4
Q)c:====:
@
@)
l!l
@
M 12 X 90
SUPPORT LEG
X2 �----
Lift the tow bar slightly. Pull out the lock lever and put the
support leg in the DOWN position, then release the lever and
make sure the leg is secured. Remove the bottom pallet.
Figures
YU2566PM02-1703
2020/3/27 14:08:53
+