background image

YARDGARD SELECT

Installation Instructions

TABLE OF CONTENTS

GETTING STARTED

STAGE 1: FENCE FRAMEWORK INSTALLATION. . . . 1

Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Fence Framework Parts List . . . . . . . . . . . . . . . . . . . . . . 1
Step 1: Installing Corner, End, and Gate Posts. . . . . . . . 2
Step 2: Installing Line Posts . . . . . . . . . . . . . . . . . . . . . . 3
Step 3: Installing Post Hardware . . . . . . . . . . . . . . . . . . . 4
Step 4: Installing Top Rail . . . . . . . . . . . . . . . . . . . . . . . . 5

STAGE 2: FENCE PANEL INSTALLATION . . . . . . . . . . 6

Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Fence Panels Parts List. . . . . . . . . . . . . . . . . . . . . . . . . . 6
Step 1: Installing Tension Wire . . . . . . . . . . . . . . . . . . . . 7
Step 2: Installing Fence Panels. . . . . . . . . . . . . . . . . . . . 8

STAGE 3: GATE INSTALLATION. . . . . . . . . . . . . . . . . . 9

Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Auto Close Gate Parts List . . . . . . . . . . . . . . . . . . . . . . . 9
Installing Gate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

ESPAÑOL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

AS A REMINDER...

 

Have

 you completed your 

YARDGARD SELECT

 Planning 

& Purchasing Guide

?

 

Have

 you purchased  all the required 

YARDGARD SELECT

 

components?

  

Do

 you have  all recommended  tools and materials  ready?

Scan  to view

 installation video

Summary of Contents for YARDGARD-FK

Page 1: ...op Rail 5 STAGE 2 FENCE PANEL INSTALLATION 6 Tools and Materials 6 Fence Panels Parts List 6 Step 1 Installing Tension Wire 7 Step 2 Installing Fence Panels 8 STAGE 3 GATE INSTALLATION 9 Tools and Mat...

Page 2: ...ody protections such as knee pads work gloves etc are also suggested Use your YARDGARD SELECT Planning Purchasing Guide to assist with your installation process Before you begin visit homedepot com or...

Page 3: ...3 Leveling Soil Surface for Adjusting Concrete Footings Fig 4 6 50 22 Post Hole Ground Ground Line Post Ground Crown If the ground is too LOW If the ground is too HIGH Level 48 Width 50 From Ground Le...

Page 4: ...P 4 INSTALLING TOP RAIL IMPORTANT ALWAYS install the top rail with the flat side facing outward Insert top rail into rail connector cup Fasten the rail to the cup with a self tapping screw inserted fr...

Page 5: ...ension band 3 from the ground Fig 12 Attach the tension wire ratchet included in the Post Hardware Kit to the tension band and tighten carriage bolt using an adjustable wrench Fig 12 Duplicate this st...

Page 6: ...the curved side Attach tension wire to fence panels with panel to wire clip using adjustable pliers Attach one clip every 2 1 2 3 Near center of each mesh panel Inside of each rail connector cup In b...

Page 7: ...op GATE Hinge Top POST Hinge Self Closing GATE Hinge Self Closing POST Hinge Gate Frame Post Gate Latch PVC Post Protector Hinge Post Latch Post Instrucciones de instalaci n del YARDGARD SELECT 2014 M...

Page 8: ...or para postes Pala Cubeta para mezclar Concreto de fraguado r pido 1 saco de 50 lb por poste Cinta m trica Cordel Estacas Nivel PRIMEROS PASOS HERRAMIENTAS Y MATERIALES Cada secci n tendr una lista d...

Page 9: ...fundidad Fig 2 Marque una l nea de terreno en la parte de abajo de cada poste a 50 pulgadas de su parte superior Fig 1 Si est realizando la instalaci n en terreno sumamente desigual o pasto grueso mar...

Page 10: ...uste la copa del conector de travesa o en el travesa o terminal superior Suba el travesa o superior Travesa o superior Manga del travesa o superior POSTE POSTE Travesa o terminal superior Inserte el t...

Page 11: ...y 14 Estire el alambre tensor hasta el trinquete para alambre tensor ubicado en el extremo opuesto de la l nea de la valla Repita los pasos anteriores y rote hasta que el alambre est tenso Repita el p...

Page 12: ...ortar el panel en el alambre vertical m s cercano utilizando el cortador de alambre Voltee el panel de manera que el panel corto se conecte a tres clips de poste a panel Conecte las dos secciones de p...

Page 13: ...isagras Fig 19 Instale la bisagra de port n de cierre autom tico sin apretarla en el armaz n del port n aproximadamente a 7 pulgadas de la parte inferior del port n Fig 19 Alinee el port n coloc ndolo...

Reviews: