![background image](http://html1.mh-extra.com/html/yardcraft/octagon-cedar-gazebo/octagon-cedar-gazebo_assembly-manual_3171935009.webp)
9
Drill Holes and fasten remaining Longest Floor
Boards, as shown in previous step.
Locate the Second Floor Boards.
Continue around the outside of the Floor and attach
all remaining Long Floor Boards.
Pre-drill one
3/16” hole through Floor Boards above
each 2x4 Diagonal Floor Joist and one (1) hole in
the center into Band Board. Then fasten using 2
1/2”
Screws, one (1) at each pre-drilled locations..
Lay out the Second Floor Boards before attaching
any of them.
Floor Assembly
Second Floor Board
Ensure angled ends are tight together. There should
be a small gap between the First & Second Floor
Boards. Ensure there is an equal gap all the way
around.