5. When assembling the Wind turbine, all the parts should be fastened with fasteners
6. Before hoisting the wind turbines, the end (which should be connected with controller) of the
tower lead should be cut away the insulating layer for 20mm or so. Then screw the three exposed
leads (shot circuit) together.
7. Before the connection between the wind turbine flange and the tower flange, please connect the
three leads of the wind turbine to the three leads of the tower accordingly. When using the hinge
method, every pair of wires should be no less than 40mm in length and be wrapped with Acetate
cloth tape for three layers, then sheathed with spun glass paint tube. With this method, connect the
three pairs of wires (attention: the joint of the wires can’t bear the weight of the tower leads
directly, so wires 100mm downward from the joint should be wrapped with adhesive tape and then
stuffed into the steel pipe. After that, wind turbine flange and tower flange can be connected.
8. During the installation, it is prohibited to revolve the rotor blades roughly (the ends of wind
turbine leads or the tower leads are short-circuited at this moment). Only after all the installation
and the examination is finished and the security of the erection crew is guaranteed, it is allowed to
dismantle short circuited leads and then connect with controller and battery before running.
Attention:
Battery should be connected with controller before wind turbine connected with controller
If above stated instruction are not followed when assembling and installing the wind
turbines, we are sorry that any problem or failure resulted are not to be covered by
warranty.