background image

2

Distinguished Users:

We are very glad that you choose our company's products and feel sure that you will find the

convenience that our products bring to you and the joy of promoting the policy of “low carbon and

environmental protection”.

Please do not forget to read the “User Installation Manual” before installing of the products.

Part1. Safety Warning and Attentions

For correct installation and use of this equipment, please read carefully the safety warning and

attention and strictly follow the instructions.

Basic requirements

●Do not disassemble the equipment by you. Please contact the specified maintenance department

when the equipment is out of order.

●Without authority, no company or individual are allowed to change the equipment structure,

safety and performance design.

●please obey local laws and regulations when using this product

Assembling requirements:

1. Before the assembly of the wind generator or in the process of maintenance, please be sure to

read the users manual first.

2. Please don’t install the wind turbines in rainy days or when the wind scale is at Level 3 or

above.

3. After opening the package, it is advised to short circuit the three leads of the wind turbines

the

exposed copper parts should be screwed together).

4. Before the installation of the wind turbine, lightning grounding must be prepared. You can

arrange the facilities according to national standards, or you may arrange them according to the

local environment and soil condition. Table 1 is for reference.

Summary of Contents for 2205

Page 1: ...1 600W USER S MANUAL ...

Page 2: ...s out of order Without authority no company or individual are allowed to change the equipment structure safety and performance design please obey local laws and regulations when using this product Assembling requirements 1 Before the assembly of the wind generator or in the process of maintenance please be sure to read the users manual first 2 Please don t install the wind turbines in rainy days o...

Page 3: ...the joint of the wires can t bear the weight of the tower leads directly so wires 100mm downward from the joint should be wrapped with adhesive tape and then stuffed into the steel pipe After that wind turbine flange and tower flange can be connected 8 During the installation it is prohibited to revolve the rotor blades roughly the ends of wind turbine leads or the tower leads are short circuited ...

Page 4: ...nent magnet rotor alternator with a special kind of stator design efficiently decrease resistance torque Meanwhile it makes the wind turbines match the generators quite well and increase its reliability 600W Rated power W 600W Rated voltage V 24V 48V Wheel diameter m 1 5 Start up wind speed m s 3 Rated wind speed m s 10 Survival wind speed m s 45 TOP NG kg 27 2KG Body material Casting aluminum Bla...

Page 5: ... enhances toughness reduce weight of the generator set and thus make it rotate more easily and safely Tail die casting spine with generator tail furls to protect wind turbine in strong wind Controller converts ac current produced by wind turbine to be dc current to charge battery Battery to store the power from wind turbine inverter to covert dc power from battery to power for family load 4 1 Wind...

Page 6: ...socket screws M10x50mm and tighten with nuts Flange set is closely marched with tower which requires punching after installation by customers so the tower we provide has no punching 2 Connection between flange and tower Connect cable respectively with three lines at the bottom of the head then pierce cable from the center of tower and short circuit three cables of wind generator ...

Page 7: ...7 Fasten flange and tower with 4 pieces of inner hex bolts 3 Installation of tail Firstly insert 2 3 4 5 6 into1 tail rudder according to the following pictures ...

Page 8: ...8 Fix moveable joint and rotary set then tighten Install the back nose cone and tighten with fixing screw 4 Install blade flange onto generator axes ...

Page 9: ...o generator axes with Fix each blade with 3 pieces of bolts nuts M12mm and fix the nuts M12x25mm with wrench then clockwise rotating Blades till blades flange and Generator axes are screw down 7 Fix nose cone at the front of wind generator with screw M6x60mm ...

Page 10: ... solve it immediately 2 Please check wind turbine right before or after storm if anything amiss it is advised to lay down slowly wind turbine to do inspection or repair If inspection needs to be done on the tower make sure wind turbine have been short circuited and protection measures taken before and election climb up 3 The free maintenance batteries should be kept externally clear 4 Do not disas...

Page 11: ...11 Part6 Packing list Serial item qty packing 1 600w generator 1 Carton Box 2 hub 1 3 Blades 3 4 dome 1 5 Tail board 1 6 Tail rod 1 7 Bolt and Nuts Several ...

Reviews: