DC Inverter U-match Series Floor Ceiling Type Unit
20
Item
Model
Size of Fitting
Pipe(inch)
Maximum
Pipe
Length
(m)
Biggest Drop
between
Indoor and
Outdoor
Units (m)
Drain Pipe
Inside
Dimension
(mm)
Liquid
Pipe
Gas
Pipe
YFC12G4/I
Φ1/4
Φ3/8
30
15
Ф17
YFC18G4/I
Φ1/2
30
20
YFC24G4/I
Φ3/8
Φ5/8
30
20
YFC30G4/I
30
25
YFC36G4/I
75
30
YFC42G4/I
75
30
YFC48G4/I
75
30
YFC60G4/I
75
30
Connection pipe should adopt water-proof insulating material. Its wall thickness
should be 0.5-1.0mm and the pipe wall should be able to withstand 6.0MPa. The
longer the connection pipe is, the worse cooling and heating performance it has.
When the drop between indoor and outdoor units is larger than 10m, an oil
return bend should be added every 6m.
The requirement on the adding of oil return bend is as below:
(1) Outdoor unit is beneath the indoor unit.
There’s no need to add non-return bend at the lowest or highest position of the
vertical pipe, as shown below: