5-24
CYLINDER HEAD
ENG
8 Nm (0.8 m
S
kg, 5.8 ft
S
lb)
NOTE:
NOTE:
19 Nm (1.9 m
S
kg, 14 ft
S
lb)
67 Nm (6.7 m
S
kg, 48 ft
S
lb)
12 Nm (1.2 m
S
kg, 8.7 ft
S
lb)
NOTE:
EAS00233
INSTALLING THE CYLINDER HEAD
1. Check:
S
cylinder head bolts
1
Retighten the cylinder head bolts to specifica-
tion, before installing the cylinder head.
2. Install:
S
gasket
New
1
S
dowel pins
3. Install:
S
cylinder head
Pass the timing chain through the timing chain
cavity.
4. Tighten:
S
cylinder head nuts
1
X
10
1st
2nd
S
cylinder head bolts
11
12
S
First, tighten the nuts
1
X
10
to approximate-
ly 19 Nm (1.9 m
S
kg, 14 ft
S
lb) with a torque
wrench, and then tighten the 67 Nm (6.7 m
S
kg,
48 ft
S
lb).
S
Lubricate the cylinder head nuts with engine
oil.
S
Tighten the cylinder head nuts in the proper
tightening sequence as shown and torque
them in two stages.
5. Install:
S
exhaust camshaft
S
intake camshaft
Refer to “INSTALLING THE CAMSHAFTS”.
Summary of Contents for YZF-R1S
Page 1: ......
Page 50: ...2 22 TIGHTENING TORQUES SPEC Cylinder head tightening sequence Crankcase tightening sequence ...
Page 56: ...2 28 1 Thermostat 2 Radiator cap 3 Radiator 4 Oil cooler COOLING SYSTEM DIAGRAMS SPEC ...
Page 57: ...2 29 ENGINE OIL LUBRICATION CHART SPEC ENGINE OIL LUBRICATION CHART ...
Page 61: ...2 33 1 Main axle 2 Oil delivery pipe 3 Drive axle LUBRICATION DIAGRAMS SPEC ...
Page 62: ...2 34 1 Cylinder head 2 Crankshaft LUBRICATION DIAGRAMS SPEC ...
Page 346: ...7 2 FUEL INJECTION SYSTEM FI 7 WIRING DIAGRAM ...
Page 401: ...8 8 IGNITION SYSTEM ELEC EAS00735 IGNITION SYSTEM CIRCUIT DIAGRAM ...
Page 420: ...8 27 LIGHTING SYSTEM ELEC EAS00780 LIGHTING SYSTEM CIRCUIT DIAGRAM ...
Page 427: ...8 34 SIGNALING SYSTEM ELEC EAS00793 SIGNALING SYSTEM CIRCUIT DIAGRAM ...
Page 436: ...8 43 COOLING SYSTEM ELEC EAS00807 COOLING SYSTEM CIRCUIT DIAGRAM ...
Page 456: ......
Page 457: ......