5-44
CHAS
HANDLEBAR
2. Install:
9
Grip cap (upper)
1
9
Grip cap (lower)
2
9
Bolt (grip cap)
3
NOTE:
Temporarily tighten the bolts (grip cap).
EC5B5210
Handlebar
1. Install:
9
Handlebar
1
9
Handlebar holder
2
9
Bolt (handlebar holder)
3
NOTE:
9
The upper handlebar holder should be installed
with the punched mark
a
forward.
9
Install the handlebar so that the marks
b
are in
place on both sides.
9
First tighten the bolts on the front side of the
handlebar holder, and then tighten the bolts on
the rear side.
2. Install:
9
Grip (left)
1
Apply the adhesive to the handlebar
2
.
NOTE:
9
Before applying the adhesive, wipe off grease
or oil on the handlebar surface
a
with a lac-
quer thinner.
9
Install the grip (left) to the handlebar so that the
line
b
between the two arrow marks faces
straight upward.
28 Nm (2.8 m•kg, 20 ft•lb)
1P8-28199-10 210
04.5.12, 7:49:02 PM